Study on Rush-Repair Scheme for Distribution Network Fault

Article Preview

Abstract:

The subject addressed is the rush-repair scheme for distribution network fault. Organization structure of rush-repair scheme is first built and rush-repair process is proposed. Confronted with the need of higher quality and higher efficiency of distribution network fault rush-repair, rush-repair command platform is developed for command center to enhance the rush-repair efficiency. The information exchanged between command platform and related various application systems is also described in detail. The proposed rush-repair scheme will provide practical techniques for efficiency improvement of fault rush-repair work of distribution network, and thus mostly abbreviate power recovery time.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 860-863)

Pages:

2554-2559

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] CUI Wei, WANG Bende, Development and application of an electrical rush repair scheduling system, Automation of Electric Power Systems, 2002, 26(19): 64-67.

Google Scholar

[2] HUANG Xianchao, ZHANG Lizi, SHU Jun, et al, Maintenance schedule optimization model in distribution systems, Automation of Electric Power Systems, 2007, 31(1): 33-37.

Google Scholar

[3] ZHANG Jingwei, ZHANG Lizi, HUANG Xianchao, A Multi-fault Rush Repair Strategy for Distribution Network Based on Genetic-topology Algorithm, Automation of Electric Power Systems, 2008, 32(22): 32-35.

Google Scholar

[4] Miao Xin, Zhang Kai, Tian Shiming, et al, Information communication system supporting smart Grid, Power System Technology, 2009, 33(17): 8-13.

Google Scholar

[5] WANG Dongqing, LI Gang, HE Feiyue, Design of Integrative Information Platform for Smart Substation, Power System Technology, 2010, 34(10): 20-25.

Google Scholar