Method of Calculating Chamber Earth Pressure of EPB Shield

Article Preview

Abstract:

In order to calculate earth pressure in working chamber, three calculation modes which corresponding to status of elastic balanced, active limit equilibrium and passive limit equilibrium of the soil on the excavation face was built. The relationship of relative displacement between the soil in the chamber and the soil on the excavation face of shallow EPB shield tunnel was analyzed based on Rankines earth pressure theory. The threshold of chamber earth pressure values which correspond to the limit states of subsidence and upheaval were deduced and the reasonable range of the values were obtained. Combined with a shield tunnel construction practice, the theoretical and measured values are compared. The results show that the theoretical equations are valid and can provide a theoretical approach for the selection of chamber earth pressure.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

426-431

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Chen K. The application and trend of shield machine, Construction mechanization, 2004, 25(2): 58~61.

Google Scholar

[2] Liu D. L. Pressure control EPB shield tunneling, Journal of rail way engineering society, 2005(2): 45~50.

Google Scholar

[3] Zhou Z. Discussion on setting earth pressure in chamber of EPB shield machine, Journal of rail way engineering society, 2011. 12: 39~42.

Google Scholar

[4] Gong X. B, Xi Y. J, Han J. Y. Selection and calculation of earth pressure of shield tunneling, Tunnel machinery & construction technology, 2007. 11: 46~48.

Google Scholar

[5] Zhang K. S, Liu S. Y. soil mechanics, China Building Industry Press, 2010. 8: 189~193, 213~218.

Google Scholar