A Method with Energy Saving for Investment Decision of Wind Power Project Based on TOPSIS

Article Preview

Abstract:

Siting of wind power projects is a problem which needs solving during the decision-making stage, so taking full consideration of all the factors is an important prerequisite for making decisions. On the basis of full consideration of various factors in wind power projects, AHP is applied to determine the index weight and TOPSIS for project selection. With these methods, a result of better accuracy and prediction is obtained. In the meantime, the method proves effective and feasible, expecting to provide a reference method for program selection of wind power construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

473-477

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] WU Yunna, BIAN Qing, LUO Wei, DONG Dapeng. The Research On The Cost Control of Wind Power Construction Project. 2010International Conference on Circuit and Signal Processing, (2010).

Google Scholar

[2] WU Yunna, BIAN Qing. An analysis of influence factors of the cost control in wind power construction projects based on the ISM Model[J]. Journal of Wuhan University of Technology(Transportation Science and Engineering) , 2012, 36(2): 257 -261.

Google Scholar

[3] WU Yunna, YANG Yisheng, FENG Tiantian, GAO Min, ZHANG Jinying. Macroscopic Site Selection of Wind-Solar Hybrid Power Station[J]. Power System Technology, 2013, 37(2): 319-325.

Google Scholar

[4] ZHU Qiang, YAN Zi- gang. Supplier Selection Decision-making Method Based on AHP and TOPSIS Algorithm[J]. Communication Standardization 2008, 02/ 03: 197-201.

Google Scholar