Research on DBR Production Scheduling System Application Based on Simulation

Article Preview

Abstract:

Traditional planning methods ignore the enterprise production capacity,the paper depend on the specific case in enterprise production to build a Production Scheduling System which applies Drum-Buffer-Rope theory. This system proposes the high output, low work in process and on time delivery as the goals, considering the bottleneck resource as well as providing the master production plan with the bottleneck resource, in addition employing the simulation optimization software-Simio to optimize the bottleneck process scheduling and raise the utilization ratio of bottleneck resource.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 889-890)

Pages:

1207-1212

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Chen Hong; Madlelbaum Avi Discrete flow networks: Bottleneck analysis and fluid approximations[J] 1991(02).

Google Scholar

[2] Yan.L., Song.B.J., Feng.H.X., Ye.J.A heuristic pmject scheduling approach for quick response to maritime disaster rescue[J].International Journal of Project Management, 2009, 27(8):620-628.

DOI: 10.1016/j.ijproman.2008.10.001

Google Scholar

[3] Jun-Huei Lee, Jia-Ging Chang, Chih-Hung Tsai, Rong-Kwei Li.Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures[J].Expert Systems with Applications, 2010, 37(5):3747.3754.

DOI: 10.1016/j.eswa.2009.11.049

Google Scholar

[4] Betterton.C.E, Cox III.J.F.Espoused drum-Buffer-rope flow control in serial lines:A comparative study of simulation models[J].International Journal of Production Economics.2009, 1(1):66-79.

DOI: 10.1016/j.ijpe.2008.08.050

Google Scholar

[5] K.M.N. Muthiah; S H Huang Overall Throughput Effectiveness (OTE) Metric for Factory-level Performance Monitoring and Bottleneck Detection (2007).

DOI: 10.1080/00207540600786731

Google Scholar

[6] Wang Li; Zhu Jing The status and advances of flexible flow shop scheduling problem[J]-Journal of Anshan Normal University 2002(01).

Google Scholar

[7] Xide Ren, Jianming Zhu, Jun Huang.Multi—period Oynamic Model for Emergency Resource Dispatching Problem in Uncertain Traffic Network[J].Systems Engineering Procedia, 2012, (5): 37.42.

DOI: 10.1016/j.sepro.2012.04.006

Google Scholar