[1]
Jung-Woo Cho, Seokwon Jeon, Sang-Hwa Yu, Soo-Ho Chang: Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method, Tunnelling and Underground Space Technology, 2010, 25, (3), 230-244.
DOI: 10.1016/j.tust.2009.11.007
Google Scholar
[2]
C. Balci: Correlation of rock cutting tests with field performance of a TBM in a highly fractured rock formation: A case study in Kozyatagi-Kadikoy metro tunnel, Turkey, Tunnelling and Underground Space Technology, 2009, 24, (4), 423-435.
DOI: 10.1016/j.tust.2008.12.001
Google Scholar
[3]
R. Gertsch, L. Gertsch, J. Rostami. Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction, International Journal of Rock Mechanics and Mining Sciences, 2007, 44, (2), 238-246.
DOI: 10.1016/j.ijrmms.2006.07.007
Google Scholar
[4]
Q.M. Gong, J. Zhao: Development of a rock mass characteristics model for TBM penetration rate prediction, International Journal of Rock Mechanics and Mining Sciences, 2009, 1, (46), 8-18.
DOI: 10.1016/j.ijrmms.2008.03.003
Google Scholar
[5]
Jafar Khademi Hamidi, Kourosh Shahriar, Bahram Rezai, Jamal Rostami: Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system, Tunnelling and Underground Space Technology, 2010, 7, (25), 333-345.
DOI: 10.1016/j.tust.2010.01.008
Google Scholar
[6]
G. Exadaktylos, M. Stavropoulou, G. Xiroudakis, M. de Broissia, H. Schwarz: A spatial estimation model for continuous rock mass characterization from the specific energy of a TBM, Rock Mechanics and Rock Engineering, 2008, 12, (41), 797-834.
DOI: 10.1007/s00603-007-0160-9
Google Scholar
[7]
Zhang Ke, Wang Tengyue, Sun Hong, Wang He, Zhao Kaijun: Simulation Study on Disc Cutter of Full Face Rock Tunnel Boring Machine, Journal of Shenyang Jianzhu University (Natural Science), 2010, 26, (6), 1209-1213.
Google Scholar
[8]
Wu Yuhou, Sun Jian, Zhou Peng, Sun Hong: Research on the Adaptability of TBM Disc Cutter to the Character of Rocks, Journal of Shenyang Jianzhu University (Natural Science), 2012, 28, (1), 156-161.
Google Scholar
[9]
Wu Yuhou, Wang Chao, Sun Hong, Zhou Peng: Ansys-based finite element analysis on cutter-plate of rock excavators, Chinese Journal of Construction Machinery, 2010, 10, (2), 171-176.
Google Scholar
[10]
Su Cuixia, Wang Yanqun, Cai Zongxi, Kang Yilan, Huang Tian: Numerical Simulation of Excavation Load on Cutterhead in Shield Tunneling Machine, Journal of Tianjin University, 2011, 44, (6), 522-528.
Google Scholar
[11]
Man Lintao, Li Shouju: Finite element numerical simulation of process of rock breaking by disc cutter, Engineering construction, 2011, 43, (4), 1-5.
Google Scholar
[12]
Yan Kehong: Technique on Tail Select ion of Slurry Shield Machine in Overlong-distance Tunneling, Railway Construction Technology, 2008, 1, 36-38.
Google Scholar
[13]
Sun Jinshan, Chen Ming, Chen Baoguo, Lu Wenbo, Zhou Chuanbo: Numerical simulation of influence factors for rock fragmentation by TBM cutters, Rock and Soil Mechanics, 2011, 32, (6), 1891-1897.
Google Scholar
[14]
He Like, Tan Qing, Yi Nianen, Wang Zhifu, Xu Zijun: Modeling Simulation and Test Study on the Disc Cutter Vertical Vibration in Shield Tunnel Machine, MACHINE TOOL &HYDRAULICS, 2013, 41(11), 49-52.
Google Scholar
[15]
Li Qingyang, Wang Nengchao, Yi Dayi: Numerical Analysis Mathematics of Scientific Computing(Fifth Edition), Tsinghua University Press, 287.
Google Scholar
[16]
Zhang Zhaohuang, Lu Xiumei, Meng Liang, Sun Fei: Theoretical analysis of rock breaking efficiency of the disc cutter, Journal of Science and Engineering, 2012, 9, (20), 199-206.
Google Scholar
[17]
Sun Hong, Zhou Peng, Sun Jian, Wang Zinan: Stress and wear of disc cutter of rock tunnel boring machine, Journal of Liaoning Technical University (Natural Science), 2013, 32(9), 1238-1241.
Google Scholar