Resource Leveling in the Project Design Process by Petri Net Using

Article Preview

Abstract:

Petri net using for dynamic design of projects is reviewed, the resource leveling algorithm is offered.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

752-756

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fifth Edition, Project Management Institute, (2013).

DOI: 10.1556/9789634545019

Google Scholar

[2] Ron Basu, Managing quality in projects: An empirical study, International Journal of Project Management, p.178–187, 32, (2014).

DOI: 10.1016/j.ijproman.2013.02.003

Google Scholar

[3] Ki-Young Jeong, Lei Wu, Jae-Dong Hong, IDEF method-based simulation model design and development, Journal of Industrial Engineering and Management, pp.337-359, 2(2), (2009).

Google Scholar

[4] Davis, R. Business Process Modeling with ARIS - A Pratical Guide. Springer, (2001).

Google Scholar

[5] Paulo Sergio Santos Jr., Joao Paulo A. Almeida, Giancarlo Guizzardi, An Ontology-Based Semantic Foundation for ARIS EPCs, SAC'10, Sierre, Switzerland, March 22-26, (2010).

DOI: 10.1145/1774088.1774114

Google Scholar

[6] H. Zhang, H. Li, M. Lu, Modeling time-constraints in construction operations through simulation, Journal of Construction Engineering and Management, p.545–555, 134 (7), (2008).

DOI: 10.1061/(asce)0733-9364(2008)134:7(545)

Google Scholar

[7] N. Wongwai, S. Malaikrisanachalee, Augmented heuristic algorithmformulti-skilled resource scheduling, Automation in Construction, p.429–445, 20 (4), (2011).

DOI: 10.1016/j.autcon.2010.11.012

Google Scholar

[8] M. Lu, H.C. Lam, F. Dai, Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization, Automation in Construction, p.670–681, 17 (6), (2008).

DOI: 10.1016/j.autcon.2007.11.004

Google Scholar

[9] A. Kastor, K. Sirakoulis, The effectiveness of resource leveling tools for resource constraint project scheduling problem, International Journal of Project Management, p.493–500, 27 (5), (2009).

DOI: 10.1016/j.ijproman.2008.08.006

Google Scholar

[10] Feifei Cheng, Heng Li, Y. -W. Wang, Martin Skitmore, Perry Forsythe, Modeling resource management in the building design process by information constraint Petri nets, International Journal of Project Management, p.92–99, 29, (2013).

DOI: 10.1016/j.autcon.2012.08.005

Google Scholar

[11] Chin, K.S., Zu, X., Mok, C.K., Tam, H.Y. Integrated Integration Definition Language (IDEF0) and colored Petri nets (CPN) modeling and simulation tool: a study on mould-making process. International Journal of Production Research, vol. 44, i. 16, p.3179–3205, (2006).

DOI: 10.1080/00207540500456161

Google Scholar

[12] Van Dongen, B.F., Van der Aalst, W.M.P., and Verbeek., H.M.W. 2005. Verification of EPCs: Using Reduction Rules and Petri Nets. In Proceedings of the 17th Conference on Advanced Information Systems Engineering (CAiSE 2005) LNCS. Vol. 3520, 372-386, Springer.

DOI: 10.1007/11431855_26

Google Scholar

[13] V.A. Jeetendra, O.V. Krishnaiah. Petri Nets for project Management and resource Levelling, Int. J. Adv. Manual. Technol. pp.516-520, (2000).

DOI: 10.1007/s001700070059

Google Scholar