Dynamic Analysis and Applied Technology in New Anti-Jamming Hydraulic System with Fast Response

Article Preview

Abstract:

In order to avoid the jamming problem of drill-rod because of slow response of existing drilling equipment when facing gaps and karst caves during drilling process, we proposed the principle scheme of a quick-response hydraulic control system which aimed at making the jackdrill return as soon as possible once detected gaps and karst caves. The model of the hydraulic system was established and then solved by AMEsim. The parameters of critical parts such as restrictors and anti-jamming group valve were optimized by simulating to achieving the shortest theoretical response time. The system has been applied to field experiment and the result shows its ascendant ability of preventing jamming failure,the response time is shorter than traditional system in half. This research has great engineering application value to improve the drilling efficiency.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

315-319

Citation:

Online since:

March 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] J. Li: The Development and Application of Hydraulic Rock Drill [J] Non-ferrous Metal(Part of Mine) , 2008(3): 36~38.

Google Scholar

[2] S.J. Xu, H.B. Zhou, X.Y. Zhou: The Research Situation of Anti-jamming System of Hydraulic Drilling Jumbo[J], Hydraulic Drilling and Pneumatic Tools, 2004(2), 13~17.

Google Scholar

[3] Anon. Atlas Copco's Roc 712HC-01 Hydraulic Crawler Drill[J] International Construction, 1986(4): 66~68.

Google Scholar

[4] C.L. Luo J.P. Hu,G.H. Zhu X.B. Yang: The Research of New Anti-jamming of Hydraulic System[J] Hydraulic Drilling and Pneumatic Tools , 2002(3):29~32.

Google Scholar

[5] J.P. Hu,X.B. Yang W.R. Wu: Computer-controlled Anti-Jamming Technology by Feedback of Feed Oil Pressure in Rock-Drilling Process [J] Journal of Nonferrous and Technology of China,1998(2):364~367.

Google Scholar

[6] H.Q. Zhao M.X. Li,B. Gao Q.H. He: On Automatic Anti-Jamming Control in the Rock-drilling Process for Down-the-hole drill[J] Mechanical Science and Technology,2008(6):739~741.

Google Scholar

[7] X.B. Yang J.P. Hu,Q. Wang J.X. Zhu: Hydraulic Rock-Drilling Jamming Mechanism and New Automatic Anti-jamming Plan[J] Central South University of Technology Press, 1995(6): 789~792.

Google Scholar

[8] M.X. Li: The Research of Automatic Anti-Jamming Control in the Rock-drilling Process for Down-the-hole drill [D], 2008, Central South University.

Google Scholar