p.1226
p.1230
p.1234
p.1240
p.1244
p.1248
p.1252
p.1257
p.1262
Research Progress of Protected Plunge Pool of High Arch Dam
Abstract:
The security researches of energy dissipation were always the focus in the High arch dams. Statistically, the trajectory type energy dissipation is the most widely used in the built high arch dams, and the protected plunge poor were always set downstream the dam body. However, the widely used protected plunge poor need large investment with the disadvantage of complicated operation and maintenance. Along with the construction of concrete high arch dam in the Southwest China, the “Reventment-Protected and Non-Bottom-Protected Plunge Pool” has been studied and proposed, which has the advantage of more simplified project design and more economy investment.
Info:
Periodical:
Pages:
1244-1247
Citation:
Online since:
April 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: