Research on Cost Control of Infrastructure Project with Prior Operation Function in Design Phase

Article Preview

Abstract:

Along with the acceleration of market-oriented economy, a number of large infrastructure projects are exposed with some obvious drawbacks. The main reason for the problems mentioned above is that traditional mode of construction and operation, especially in the design phase of the project only focus on investment control, however, ignoring the operational functions. Given the situation that design phase is the key stage to control the cost and functional design, this paper mainly focuses on cost control of infrastructure project with prior operation function in design phase, which is designed to achieve the best match of function and cost in order to improve project value as well as promote sustainable development of infrastructure projects from the perspective through construction investment control organizational model, and value engineering methods.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

1482-1486

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Guowu. Systems Engineering, 2000(4), pp.43-48. In Chinese.

Google Scholar

[2] Zhang Ming, Xu Ruihua Yang Ke. Urban Mass Transit, 2007(11), pp.44-49. In Chinese.

Google Scholar