Excavation unloading zone corresponds to stress decreased area of slope rock mass after excavation. Quality of slope rock mass in this area will be degraded due to excavation disturbance, and the mechanical parameters of rock mass will be also degraded accordingly. Therefore, determining the range of excavation unloading zone accurately is one of the key factors to ensure the rationality and validity of numerical simulation results of rock slope excavation. In this paper, the range of excavation unloading zone is determined by comparing stress field before and after excavation, choosing stress component perpendicular to excavation face as comparative standard in calculation, which can be calculated by computer program with FLAC software. Stress adjustment of slope rock mass due to excavation is a dynamic and changing progress, so the range of excavation unloading zone is changing during excavation, which can be achieved by a cycling program in numerical simulation. The correctness and usefulness of this method is proved by the calculation results of example analysis.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

701-705

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Wang Hao, Liao Xiaoping, Research on the mechanical Character of relaxing zone of slopes due to excavation, The Chinese journal of geotechnical hazard and control, vol. 18(2007), pp.5-10.

Google Scholar

[2] Li Jianlin: Unloading Rock Mass Mechanics (China Water & Power Press, Beijing 2003).

Google Scholar

[3] Lei Tao, Zhou Keping, Hu Jianhua, and Gao Feng, Mechanical parameters deterioration laws of unloading rock mass by meso-damage mechanics, Journal of Central South University(Science and Technology, vol. 44(2013), pp.275-281.

Google Scholar

[4] Ma Yu, Ren Guangming, Luo Yi, Zhou Wei, and Feng Rui, Application research on unloading zoing quantitative indicatory of rocky slope, Yangtze River, vol. 44(2013), pp.33-36.

Google Scholar

[5] Cai Jian, Liu Jie, Yuan Xianfan, Xiao Lei, and Wan Liangpeng, Dynamic excavation unloading response of high steep rocky slope of Rumei hydropower station, Yangtze River, vol. 44(2013), pp.51-54.

Google Scholar

[6] Ha Qiuling, and Zhang Tiantian, Analysis on one underground nuclear waste repository rock mass in USA, Nuclear power engineering, vol. 33(2012), pp.13-16.

Google Scholar

[7] Wang Xingxia, Study on triaxial test of sandstone under loading and unloading conditions and its application, (WuhanUniversity Doctor thesis, 2012).

Google Scholar