Reliability Allocation of Seafloor Observation Network by Using Monte Carlo Method

Article Preview

Abstract:

Seafloor observation network provides limited opportunity for repair due to the atrocious weather on the sea. As a result, reasonable reliability allocation methods are required to assure the network is sufficiently reliable during expected years. In this thesis, betweenness is used for evaluating the importance of component based on binary search algorithm, and residual connectedness reliability is calculated according to Monte Carlo method to avoid combinatorial explosion. This method is applied on meshed seafloor observation network to obtain satisfying reliability allocation for backbone nodes. Further, the relationship between nodes reliability allocation and residual connectedness reliability is discussed, on the basis of which certain suggestions for network improvement are proposed.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 926-930)

Pages:

1997-2000

Citation:

Online since:

May 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] K. Asakawa: Scientific Use of Submarine Cables and Related Technologies(Tokyo, Japan, June 6-10, 2003). Vol. 1 , p.307.

Google Scholar

[2] X. Chen, Y. Ye and D. Li: The Ocean Engineering, Vol. 27 (2009) No. 4, p.121. In Chinese.

Google Scholar

[3] C.F. Linton: Sociometry, Vol. 40 (1977) No. 1, p.35.

Google Scholar

[4] R. Li and W. Ren: Journal of Beijing University of Aeronautics and Astronautics, Vol. 38 (2012) No. 2, p.228. In Chinese.

Google Scholar

[5] A. Maffei: Scientific Use of Submarine Cables and Related Technologies(Tokyo, Japan, June 6-10, 2003). Vol. 1 , p.191.

Google Scholar

[6] E. Bompard, D. Wu and F. Xue: Electric Power Systems Research, Vol. 81 (2011) No. 1, p.1334.

Google Scholar