[1]
Orr C. Dams and Development: A New Framework for Decision-Making. The report of the World Commission on Dams. 2000. Earthscan Publications Ltd., London. 448 pp. [R]. (2001).
Google Scholar
[2]
Ahmad B, Wood C. A comparative evaluation of the EIA systems in Egypt, Turkey and Tunisia[J]. Environmental Impact Assessment Review, 2002, 22(3): 213-234.
DOI: 10.1016/s0195-9255(02)00004-5
Google Scholar
[3]
Liou Y, Lo S. A fuzzy index model for trophic status evaluation of reservoir waters[J]. Water Research, 2005, 39(7): 1415-1423.
DOI: 10.1016/j.watres.2005.01.014
Google Scholar
[4]
Oblinger J A, Moysey S M J, Ravindrinath R, et al. A pragmatic method for estimating seepage losses for small reservoirs with application in rural India[J]. Journal of Hydrology, 2010, 385(1–4): 230-237.
DOI: 10.1016/j.jhydrol.2010.02.023
Google Scholar
[5]
Terra B F, Ara U Jo F G. A preliminary fish assemblage index for a transitional river-reservoir system in southeastern Brazil[J]. Ecological Indicators, 2011, 11(3): 874-881.
DOI: 10.1016/j.ecolind.2010.11.006
Google Scholar
[6]
Bartell S M, Lefebvre G, Kaminski G, et al. An ecosystem model for assessing ecological risks in Québec rivers, lakes, and reservoirs[J]. Ecological Modelling, 1999, 124(1): 43-67.
DOI: 10.1016/s0304-3800(99)00155-6
Google Scholar
[7]
Sankoh O A. An evaluation of the analysis of ecological risks method in environmental impact assessment[J]. Environmental Impact Assessment Review, 1996, 16(3): 183-188.
DOI: 10.1016/0195-9255(96)00021-2
Google Scholar
[8]
Burke M, Jorde K, Buffington J M. Application of a hierarchical framework for assessing environmental impacts of dam operation: Changes in streamflow, bed mobility and recruitment of riparian trees in a western North American river[J]. Journal of Environmental Management, 2009, 90, Supplement 3: S224-S236.
DOI: 10.1016/j.jenvman.2008.07.022
Google Scholar
[9]
Howard A, Easthope M P. Application of a model to predict cyanobacterial growth patterns in response to climatic change at Farmoor Reservoir, Oxfordshire, UK[J]. Science of The Total Environment, 2002, 282–283: 459-469.
DOI: 10.1016/s0048-9697(01)00929-9
Google Scholar
[10]
Shutes R B E. Artificial wetlands and water quality improvement[J]. Environment International, 2001, 26(5): 441-447.
DOI: 10.1016/s0160-4120(01)00025-3
Google Scholar
[11]
Pérez-Díaz J I, Wilhelmi J R. Assessment of the economic impact of environmental constraints on short-term hydropower plant operation[J]. Energy Policy, 2010, 38(12): 7960-7970.
DOI: 10.1016/j.enpol.2010.09.020
Google Scholar
[12]
Vanderhaegen M, Muro E. Contribution of a European spatial data infrastructure to the effectiveness of EIA and SEA studies[J]. Environmental Impact Assessment Review, 2005, 25(2): 123-142.
DOI: 10.1016/j.eiar.2004.06.011
Google Scholar
[13]
Ciroth A. Cost data quality considerations for eco-efficiency measures[J]. Ecological Economics, 2009, 68(6): 1583-1590.
DOI: 10.1016/j.ecolecon.2008.08.005
Google Scholar
[14]
Yi Y, Yang Z, Zhang S. Ecological influence of dam construction and river-lake connectivity on migration fish habitat in the Yangtze River basin, China[J]. Procedia Environmental Sciences, 2010, 2: 1942-(1954).
DOI: 10.1016/j.proenv.2010.10.207
Google Scholar
[15]
McCartney M P, Sullivan C, Acreman M C. Ecosystem impacts of large dams[J]. Background Paper, 2001(2).
Google Scholar
[16]
Quigley T M, Haynes R W, Hann W J. Estimating ecological integrity in the interior Columbia River basin[J]. Forest Ecology and Management, 2001, 153(1–3): 161-178.
DOI: 10.1016/s0378-1127(01)00459-5
Google Scholar
[17]
Ahammed A K M R, Nixon B M. Environmental impact monitoring in the EIA process of South Australia[J]. Environmental Impact Assessment Review, 2006, 26(5): 426-447.
DOI: 10.1016/j.eiar.2005.09.002
Google Scholar
[18]
Bodnár F, Spaan W, Hulshof J. Ex-post evaluation of erosion control measures in southern Mali[J]. Soil and Tillage Research, 2007, 95(1–2): 27-37.
DOI: 10.1016/j.still.2006.10.007
Google Scholar
[19]
Tetteh I, Awuah E, Frempong E. Post-project analysis: The use of a network diagram for environmental evaluation of the Barekese Dam, Kumasi, Ghana[J]. Environmental Modeling and Assessment, 2006, 11(3): 235.
DOI: 10.1007/s10666-005-9021-7
Google Scholar
[20]
Anbari F T, Carayannis E G, Voetsch R J. Post-project reviews as a key project management competence[J]. Technovation, 2008, 28(10): 633-643.
DOI: 10.1016/j.technovation.2007.12.001
Google Scholar
[21]
Welbank M, Cox S. The social and environmental effects of large dams volume 2: Case studies: edited by E. Goldsmith and N. Hildyard Wadebridge Ecological Centre, Camelford, UK, 1986, 331 pp[J]. Land Use Policy, 1987, 4(3): 352-354.
DOI: 10.1016/0264-8377(87)90037-8
Google Scholar