Dynamic Reentrant Scheduling Simulation for Assembly and Test Production Line in Semiconductor Industry

Article Preview

Abstract:

Production scheduling in semiconductor production line is a complex combinatorial optimization problem. It is featured by reentrant production, product variety, frequent machine breakdown and especially reentrant phenomenon and dynamic randomness, which conduces enormous complexity to production line scheduling and management. Based on the resource conflict resolution strategies, dynamic scheduling models for a semiconductor production system are proposed here, aiming at finding maximum machine utilization, optimal man-machine ratio (MMR) and maximum output. Then the validity of the model is illustrated by a simulation case.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 97-101)

Pages:

2418-2422

Citation:

Online since:

March 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z.J. Wang, Q.D. Wu: Computer Integrated Production System, Vol. 8(2002), pp.607-611. (In Chinese).

Google Scholar

[2] X.F. Wang, H.Y. Gu: Computer Integrated Production System, Vol. 13(2007), pp.1115-1120. (In Chinese).

Google Scholar

[3] L.L. F. Qiao, H. Jiang and Q.D. Wu: Computer Integrated Production System, Vol. 10(2004), pp.945-954. (In Chinese).

Google Scholar

[4] N.B. Ho, J.C. Tay: IEEE Transaction on System, Man, and Cybernetics, Vol. 38(2008), pp.674-685.

Google Scholar

[5] X.L. Wu, S.D. Sun, J.J. Yu and Zh.H. Fang: Computer Integrated Production System, Vol. 12(2006), pp.731-736. (In Chinese).

Google Scholar

[6] J.H. Wei, J.Q. Han and G.J. Sun: Journal of System Simulation, Vol. 13(2001), pp.133-138. (In Chinese).

Google Scholar

[7] F. Qiao, X.H. Xu, M. Fang and Q.D. Wu: Journal of Tongji University (Natural Science), Vol. 35(2007), pp.537-542. (In Chinese).

Google Scholar

[8] J.J. Yu, X.J. Xu and F. Ye: Proceedings of the 15th IEEE International Conference on Management Science & Engineering, (2008), pp.541-548.

Google Scholar

[9] P. Fattahi, F. Jolai and J. Arkat: Applied Mathematical Modeling, Vol. 33(2009), pp.3076-3087.

DOI: 10.1016/j.apm.2008.10.029

Google Scholar

[10] W.H. Hou, D.Y. Ma, F. Chen, Zh.Y. Zhang and M. Dong: Industrial Engineering and Management, Vol. 10(2005), pp.37-41. (In Chinese).

Google Scholar