Dynamic Reentrant Scheduling Simulation for Assembly and Test Production Line in Semiconductor Industry

Abstract:

Article Preview

Production scheduling in semiconductor production line is a complex combinatorial optimization problem. It is featured by reentrant production, product variety, frequent machine breakdown and especially reentrant phenomenon and dynamic randomness, which conduces enormous complexity to production line scheduling and management. Based on the resource conflict resolution strategies, dynamic scheduling models for a semiconductor production system are proposed here, aiming at finding maximum machine utilization, optimal man-machine ratio (MMR) and maximum output. Then the validity of the model is illustrated by a simulation case.

Info:

Periodical:

Advanced Materials Research (Volumes 97-101)

Edited by:

Zhengyi Jiang and Chunliang Zhang

Pages:

2418-2422

DOI:

10.4028/www.scientific.net/AMR.97-101.2418

Citation:

A. J. Liu et al., "Dynamic Reentrant Scheduling Simulation for Assembly and Test Production Line in Semiconductor Industry", Advanced Materials Research, Vols. 97-101, pp. 2418-2422, 2010

Online since:

March 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.