[1]
D.V. Kumar, G.M. Mohan, and K.M. Mohanasundaram, "Lean Tool Implementation in the Garment Industry," Fibres Text. East. Eur., vol. 27, no. 2(134), p.19–23, Apr. 2019.
DOI: 10.5604/01.3001.0012.9982
Google Scholar
[2]
R.S. Mor, A. Bhardwaj, S. Singh, and A. Sachdeva, "Productivity gains through standardization-of-work in a manufacturing company," J. Manuf. Technol. Manag., vol. 30, no. 6, p.899–919, 2019.
DOI: 10.1108/JMTM-07-2017-0151
Google Scholar
[3]
PRODUCE, "Estudio de la situación actual de las empresas peruanas: los determinantes de su productividad y orientación exportadora," Encuesta Nac. Empres., p.182, 2017, [Online]. Available: https://cdn.www.gob.pe/uploads/document/file/299953/d29294_opt.pdf.
Google Scholar
[4]
A. Dresch, D. R. Veit, P. N. de Lima, D. P. Lacerda, and D. C. Collatto, "Inducing Brazilian manufacturing SMEs productivity with Lean tools," Int. J. Product. Perform. Manag., vol. 68, no. 1, p.69–87, Jan. 2019.
DOI: 10.1108/IJPPM-10-2017-0248
Google Scholar
[5]
M. Alefari, M. Almanei, and K. Salonitis, "Lean manufacturing, leadership and employees: the case of UAE SME manufacturing companies," Prod. Manuf. Res., vol. 8, no. 1, p.222–243, Jan. 2020.
DOI: 10.1080/21693277.2020.1781704
Google Scholar
[6]
R. K. Singh and A. Gurtu, "Prioritizing success factors for implementing total productive maintenance (TPM)," J. Qual. Maint. Eng., 2021.
DOI: 10.1108/JQME-09-2020-0098
Google Scholar
[7]
A. Thawkar, P. Tambe, and V. Deshpande, "A reliability centred maintenance approach for assessing the impact of maintenance for availability improvement of carding machine," Int. J. Process Manag. Benchmarking, vol. 8, no. 3, p.318, 2018.
DOI: 10.1504/IJPMB.2018.092891
Google Scholar
[8]
L.W. Hooi and T.Y. Leong, "Total productive maintenance and manufacturing performance improvement," J. Qual. Maint. Eng., vol. 23, no. 1, p.2–21, 2017.
DOI: 10.1108/JQME-07-2015-0033
Google Scholar
[9]
J. Rukijkanpanich and M. Mingmongkol, "Enhancing performance of maintenance in solar power plant," J. Qual. Maint. Eng., vol. 26, no. 4, p.575–591, Sep. 2020.
DOI: 10.1108/JQME-11-2018-0098
Google Scholar
[10]
J. Rukijkanpanich and P. Pasuk, "Maintenance management for transportation process in quarry industry," J. Qual. Maint. Eng., vol. 24, no. 2, p.185–199, 2018.
DOI: 10.1108/JQME-04-2017-0024
Google Scholar
[11]
B. S. Gandhare, M. M. Akarte, and P. P. Patil, "Maintenance performance measurement - A case of the sugar industry," J. Qual. Maint. Eng., vol. 24, no. 1, p.79–100, 2018.
DOI: 10.1108/JQME-07-2016-0031
Google Scholar
[12]
C. Y. Huang, D. Lee, S. C. Chen, and W. Tang, "A Lean Manufacturing Progress Model and Implementation for SMEs in the Metal Products Industry," Processes, vol. 10, no. 5, May 2022.
DOI: 10.3390/pr10050835
Google Scholar
[13]
D. E. Ighravwe and S. A. Oke, "Sustenance of zero-loss on production lines using Kobetsu Kaizen of TPM with hybrid models," Total Qual. Manag. Bus. Excell., vol. 31, no. 1–2, p.112–136, Jan. 2020.
DOI: 10.1080/14783363.2017.1415754
Google Scholar
[14]
N. Ahmad, J. Hossen, and S. M. Ali, "Improvement of overall equipment efficiency of ring frame through total productive maintenance: a textile case," Int. J. Adv. Manuf. Technol., vol. 94, no. 1–4, p.239–256, Jan. 2018.
DOI: 10.1007/S00170-017-0783-2
Google Scholar
[15]
S. Hasan, G. Khan, M. R. Hoque, F. Hassan, and N. Ahmed, "Lean practices in the Bangladeshi ready-made garments industry and global significance," Int. J. Logist. Res. Appl., vol. 25, no. 3, p.309–327, 2022.
DOI: 10.1080/13675567.2020.1847262
Google Scholar
[16]
J. S. Randhawa and I. S. Ahuja, "5S – a quality improvement tool for sustainable performance: literature review and directions," International Journal of Quality and Reliability Management, vol. 34, no. 3. Emerald Group Publishing Ltd., p.334–361, 2017.
DOI: 10.1108/IJQRM-03-2015-0045
Google Scholar
[17]
I. S. Ahuja and H. Singh, "Evaluating the effectiveness of 5S implementation practices in Indian manufacturing industry," Int. J. Product. Qual. Manag., vol. 25, no. 4, p.506–555, 2018.
DOI: 10.1504/IJPQM.2018.096093
Google Scholar
[18]
A. Karevan, K. F. Tee, and M. Vasili, "A reliability-based and sustainability-informed maintenance optimization considering risk attitudes for telecommunications equipment," Int. J. Qual. Reliab. Manag., vol. 38, no. 4, p.873–891, Mar. 2021.
DOI: 10.1108/IJQRM-04-2020-0114
Google Scholar
[19]
J.S. Randhawa and I.S. Ahuja, "Evaluating impact of 5S implementation on business performance," Int. J. Product. Perform. Manag., vol. 66, no. 7, p.948–978, 2017.
DOI: 10.1108/IJPPM-08-2016-0154
Google Scholar
[20]
J.S. Randhawa and I. S. Ahuja, "An evaluation of effectiveness of 5S implementation initiatives in an Indian manufacturing enterprise," Int. J. Product. Qual. Manag., vol. 24, no. 1, p.101–133, 2018.
DOI: 10.1504/IJPQM.2018.091170
Google Scholar
[21]
O. Bataineh, T. Al-Hawari, H. Alshraideh, and D. Dalalah, "A sequential TPM-based scheme for improving production effectiveness presented with a case study," J. Qual. Maint. Eng., vol. 25, no. 1, p.144–161, Mar. 2019.
DOI: 10.1108/JQME-07-2017-0045
Google Scholar
[22]
B. Suhardi, M. Hermas Putri K.S, and W. A. Jauhari, "Implementation of value stream mapping to reduce waste in a textile products industry," Cogent Eng., vol. 7, no. 1, Jan. 2020.
DOI: 10.1080/23311916.2020.1842148
Google Scholar
[23]
J. Singh and H. Singh, "Justification of TPM pillars for enhancing the performance of manufacturing industry of Northern India," Int. J. Product. Perform. Manag., vol. 69, no. 1, p.109–133, Jan. 2020.
DOI: 10.1108/IJPPM-06-2018-0211
Google Scholar
[24]
J. Singh, H. Singh, and V. Sharma, "Success of TPM concept in a manufacturing unit – a case study," Int. J. Product. Perform. Manag., vol. 67, no. 3, p.536–549, 2018.
DOI: 10.1108/IJPPM-01-2017-0003
Google Scholar
[25]
C.O. Chan and H.L. Tay, "Combining lean tools application in kaizen: a field study on the printing industry," Int. J. Product. Perform. Manag., vol. 67, no. 1, p.45–65, 2018.
DOI: 10.1108/IJPPM-09-2016-0197
Google Scholar
[26]
S. Kumar, A. K. Dhingra, and B. Singh, "Process improvement through Lean-Kaizen using value stream map: a case study in India," Int. J. Adv. Manuf. Technol., vol. 96, no. 5–8, p.2687–2698, May 2018.
DOI: 10.1007/s00170-018-1684-8
Google Scholar
[27]
J.S. Randhawa and I. S. Ahuja, "An investigation into mufacturing performance achievements accrued by Indian manufacturing organization through strategic 5S practicesAn investigation into man," Int. J. Product. Perform. Manag., vol. 67, no. 4, p.754–787, 2018.
DOI: 10.1108/IJPPM-06-2017-0149
Google Scholar
[28]
T.K. Agustiady and E. A. Cudney, "Total productive maintenance," Total Qual. Manag. Bus. Excell., p.1–8, Feb. 2018.
DOI: 10.1080/14783363.2018.1438843
Google Scholar
[29]
J. Reyes, K. Alvarez, A. Martínez, and J. Guamán, "Total productive maintenance for the sewing process in footwear," J. Ind. Eng. Manag., vol. 11, no. 4, p.814–822, 2018.
DOI: 10.3926/jiem.2644
Google Scholar
[30]
G.F. Correia Pinto, F. José Gomes da Silva, N. Octávio Garcia Fernandes, R. Carla Barros Casais, A. Baptista da Silva, and C. Jorge Vale Carvalh, "Implementing a maintenance strategic plan using TPM methodology," Int. J. Ind. Eng. Manag., vol. 11, no. 3, p.192–204, Sep. 2020.
DOI: 10.24867/IJIEM-2020-3-264
Google Scholar
[31]
Z.T. Xiang and C. J. Feng, "Implementing total productive maintenance in a manufacturing small or medium-sized enterprise," J. Ind. Eng. Manag., vol. 14, no. 2, p.152–175, 2021.
DOI: 10.3926/jiem.3286
Google Scholar
[32]
E.I. Basri, I.H.A. Razak, H. Ab-Samat, and S. Kamaruddin, "Preventive maintenance (PM) planning: A review," Journal of Quality in Maintenance Engineering, vol. 23, no. 2. Emerald Group Publishing Ltd., p.114–143, 2017.
DOI: 10.1108/JQME-04-2016-0014
Google Scholar
[33]
F. Saleem, S. Nisar, M. A. Khan, S. Z. Khan, and M. A. Sheikh, "Overall equipment effectiveness of tyre curing press: A case study," J. Qual. Maint. Eng., vol. 23, no. 1, p.39–56, 2017.
DOI: 10.1108/JQME-06-2015-0021
Google Scholar
[34]
G.L.D. Wickramasinghe and A. Perera, "Effect of total productive maintenance practices on manufacturing performance investigation of textile and apparel manufacturing firms," J. Manuf.Technol.Manag., vol. 27, no.5, pp.713-729, Jun. 2016.
DOI: 10.1108/JMTM-09-2015-0074
Google Scholar
[35]
A. Bashar, A. A. Hasin, and N. Jahangir, "Linkage between TPM, people management and organizational performance," J. Qual. Maint. Eng., vol. 28, no. 2, p.350–366, Mar. 2022.
DOI: 10.1108/JQME-11-2019-0105
Google Scholar
[36]
P.H. Tsarouhas, "Evaluation of maintenance management through the overall equipment effectiveness of a yogurt production line in a medium-sized Italian company," Int. J. Product. Qual. Manag., vol. 16, no. 3, p.298–311, 2015.
DOI: 10.1504/IJPQM.2015.071504
Google Scholar
[37]
K.F. Tee and E. Ekpiwhre, "Reliability-based preventive maintenance strategies of road junction systems," Int. J. Qual. Reliab. Manag., vol. 36, no. 5, p.752–781, Apr. 2019.
DOI: 10.1108/IJQRM-01-2018-0018
Google Scholar
[38]
V. Sonmez, M. C. Testik, and O. M. Testik, "Overall equipment effectiveness when production speeds and stoppage durations are uncertain," Int. J. Adv. Manuf. Technol., vol. 95, no. 1–4, p.121–130, Mar. 2018.
DOI: 10.1007/s00170-017-1170-8
Google Scholar