[1]
Information Notice 90-10: Primary Water Stress Corrosion Cracking of INCONEL 600 (February 23, 1990).
Google Scholar
[2]
Generic Letter 97-001: Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations (April 1, 1997).
Google Scholar
[3]
Information Notice 2001-05: Through-wall Circumferential Cracking of Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzles at Oconee Nuclear Station, Unit 3 (April 30, 2001).
Google Scholar
[4]
Bulletin 2001-01: Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (August 3, 2001).
Google Scholar
[5]
Information Notice 2002-11: Recent Experience with Degradation of Reactor Pressure Vessel Head (March 12, 2002).
Google Scholar
[6]
Bulletin 2002-01: Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity (March 18, 2002).
Google Scholar
[7]
Information Notice 2002-13: Possible Indicators of Ongoing Reactor Pressure Vessel Head Degradation (April 4, 2002).
Google Scholar
[8]
Bulletin 2002-02: Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs (August 9, 2002).
Google Scholar
[9]
Information Notice 2003-02: Recent Experience with Reactor Coolant System Leakage and Boric Acid Corrosion (January 16, 2003).
Google Scholar
[10]
NRC Order EA-03-009: Issuance of order establishing interim inspection requirements for reactor pressure vessel heads at pressurized water reactors (February 11, 2003).
Google Scholar
[11]
The NRC issued Regulatory Issue Summary 2003-013: NRC Review of Responses to Bulletin 2002-01, 'Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
Google Scholar