p.106
p.110
p.114
p.118
p.122
p.126
p.130
p.134
p.138
Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
Abstract:
The resource-constrained project scheduling problem (RCPSP) exists widely in engineering. There have been many heuristics for the RCPSP, therefore, how to evaluate them and then choose a proper algorithm, is a focus issue recently. This paper presents a new evaluation method of heuristics for a special RCPSP based on activity-on-the-node networks. The method is aimed at finding at the regression equation between network measures and a performance measure. Technical details of the method, which include the design of a random network generator, the definitions of network measures and its concrete steps, are discussed. A case study in an electric machinery manufacturing enterprise illustrates that the evaluation method is good practice.
Info:
Periodical:
Pages:
122-125
Citation:
Online since:
March 2010
Authors:
Keywords:
Price:
Сopyright:
© 2010 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: