Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem

Article Preview

Abstract:

The resource-constrained project scheduling problem (RCPSP) exists widely in engineering. There have been many heuristics for the RCPSP, therefore, how to evaluate them and then choose a proper algorithm, is a focus issue recently. This paper presents a new evaluation method of heuristics for a special RCPSP based on activity-on-the-node networks. The method is aimed at finding at the regression equation between network measures and a performance measure. Technical details of the method, which include the design of a random network generator, the definitions of network measures and its concrete steps, are discussed. A case study in an electric machinery manufacturing enterprise illustrates that the evaluation method is good practice.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 431-432)

Pages:

122-125

Citation:

Online since:

March 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G.C. Tang, F. Zhang, S.C. Luo and L.L. Liu: Theory of Modern Scheduling (Shanghai Science Popularization Press, China 2003) (in Chinese).

Google Scholar

[2] E. Demeulemeester, M. Vanhoucke and W. Herroelen: Journal of Scheduling , Vol. 6 (2003), p.17.

Google Scholar

[3] S.J. Bai: Operations Research and Management Science, Vol. 8 (2) (1999), p.6. (in Chinese).

Google Scholar

[4] P.R. Thomas and S. Salhi: Journal of the Operational Research Society, Vol. 48 (1997), p.34.

Google Scholar

[5] S. Hartmann and R. Kolisch: European Journal of Operational Research, Vol. 127 (2000), p.394.

Google Scholar

[6] R. Kolisch and S. Hartmann: European Journal of Operational Research, Vol. 174 (2006), p.23.

Google Scholar