Material Properties and Fatigue Safety Evaluation of Old Metal Bridges

Article Preview

Abstract:

Lanzhou Zhongshan Bridge, which is located in the center of Lanzhou city, is a rivet truss bridge built in 1909. It is the first iron bridge over the Yellow River as well as a national cultural relic. An original steel angel cut off from Lanzhou Zhongshan Bridge was used to carry out a series of tests including material mechanics, fracture and fatigue property. Based on the test results, the fatigue and fracture safety was evaluated during the bridge remaining service life. Whats more, remaining service life of Lanzhou Zhongshan Bridge was calculated and found that the trucks weight more than 120 kN should be limited to ensure the safety.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 525-526)

Pages:

137-140

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Metallic Materials Tensile Testing at Ambient Temperature(GB/T 228-2002) (China Plan Publications, Beijing 2002).

Google Scholar

[2] Steel and Steel Products—Location and Preparation of Test Pieces for Mechanical Testing(GB2975-1998) (China Plan Publications, Beijing 1998).

Google Scholar

[3] Metallic Materials-Charpy Notch Impact Test(GB/T 229-1994) (China Plan Publications, Beijing 1994).

Google Scholar

[4] Determination of Charpy Impact Fracture Surface for Metallic Materials(GB/T 12778-91) (China Plan Publications, Beijing 1991).

Google Scholar

[5] Chunsheng Wang: Assessment of Remaining Fatigue Life and Service Safety for Riveted Steel Bridges(The Tongji University Press. Shanghai 2007).

Google Scholar