Influential Parameter Study on the Main-Cable State of Self-Anchored Suspension Bridge

Article Preview

Abstract:

This paper made a thorough influencing parameter analysis on the unstressed state and completed state of main cable of self-anchored suspension bridge. The main cable curve, the amount and the action point of the resultant force of main cable on the main saddle were considered as the controlling objectives, the rational completed state of main cable was defined; Wusong bridge in Jilin city was taken as an example, the finite element mode of main cable was created. The unstressed state and the completed state of main cable under different parameters were calculated, and all the results were compared with the reference state, the influences of each parameter deviation on the state of main cable were studied: the self-weight and erection temperature of main cable had little effect on the state of main cable; the length of the mid-span main cable mainly influenced itself line-shape, while the length of the side-span main cable had significant effect on each controlling objective; made the unstressed line-shape of main cable as the controlling condition, the position deviation of the main saddle and back anchorage facet, happened before the main cable erection stage, had little effect on the completed state, but which will have great effect on the completed state when they happened after the main cable erection stage. Engineering example analysis results showed that, the tensile stiffness of main cable and the boom-completed force would have some effect on the completed state of main cable, and the tensile stiffness of main cable and the self-weight of the main beam should be tested before erecting the main cable, in the same time the deviation should be control within the rational limits; recommended that the unstressed shape of main cable should pre-lift, which could counteract the deformation of the main saddle and the back anchorage facet at the completed stage, this conclusion had a strong guiding significance and reference value on the work of constructing the main cable of self-anchored suspension bridge.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

99-108

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Shen Ruili. Calculation Methods for Design and Erection of Cable Curve of Suspension Bridge [J]. China Civil Engineering Journal, 1996, 29(2):3 -9.

Google Scholar

[2] Cheng Bin, Sun Haitao, Xiao Rucheng. [J]. Journal of South C hina University of Techno logy (Natural Science Edition), 2008, 36(6):17-24.

Google Scholar

[3] Wang Jiezao, Zhong Jiwei. Analysis of Major Parameters Having Influences on Geometry of Main Cables of Long Span Suspension Bridge[J]. Bridge Construction, 2003, 3:21-24.

Google Scholar

[4] Zhou Song, Ye Zhilong, Yan Yong, Wang Wugang. Affection Anslysis on the Parameter Deviation to the Construction Line-shape of the Main Cable of the Xihoumen Bridge [J]. Sichuan Architecture, 2007, 27(4):178-180.

Google Scholar

[5] Fan Lichu, Pan Yongren, Du Guohua. Study on the Fine method of calculating the Eerection-Parameters of Long-Span Suspension Bridge [J]. China Civil Engineering Journal, 1999, 32(6): 20-25.

Google Scholar

[6] Tang Maolin, Wang Changjiang, Shen Ruili. Monitoring and Analysis of Datum Strand of the Xi Houmen Suspension Bridge [J]. Journal of Chongqing Jiaotong University(Natural Science), 2008, 27(4): 532-536.

Google Scholar

[7] Anaysis of Finished Main Cable Shape of Self- anchored Suspension Bridges with Single Tower[J], Journal of Fuzhou university(Natural Science Edition), 2009, 37(4): 567-572.

Google Scholar

[8] Irivine, H.M., Caughey, T.K. The linear theroy of vibration of a suspended cable [J]. Proceeding of .Royal Society, 1974, 341(A): 299-315.

Google Scholar

[9] Li Chuanxi, Liu Guangdong, Ke Hongjun. A Convergent Algorithm for Numberical-Analytic Method of Calculating Main Cable System of Suspension Bridge [J]. Engineering Mechanics, 2008, 25(7): 66-73.

Google Scholar

[10] Chen Changsong, Chen Zhangqing, Yan Donghuang. Accurate Interation Method to Calculate the Initial States of Main Cables of Suspension Bridges [J]. Engineering Mechanics, 2006, 23(8): 62-68.

Google Scholar