Search Options

Sort by:

Sort search results by

Publication Type:

Publication Type filter

Open access:

Publication Date:

Periodicals:

Periodicals filter

Search results

Online since: March 2011
Authors: Wen Xing Wang, Qing He Chu
The Application of Communication for Inspection System in 500kV Transformer Substation Wang Wenxing, CHU Qing-he North China University of Water Resources and Electric Power Zheng zhou China 450011 Keywords: Equipment inspection; Bluetooth technology; Transformer substation Abstract.
Even if have the high professional quality, the operational status of equipment are more understanding, professional quality is also high, inspection personnel can consciously visited the place where should be checked, but with the expansion of power scale, the increasing number of the equipment and complexity of operation increasing, the information is not fast during the polling, hidden danger could have been ignored.
Online since: September 2013
Authors: Yuan Yang
However, DAML+OIL as the development foundation refers to a strict logic description language, but its complex symbols are only understood and known by a small number of professionals.
Design and Implementation of Multi-Source Database for Regional Water System [J].
Online since: November 2014
Authors: Zhan Gang Su
Construction site layout is reasonable, to ensure the construction smoothly, is helpful to ensure the quality, in particular to the site area of the road, the flood control and drainage [2,3], equipment storage, water supply and power supply, concrete and main vertical transportation machinery equipment layout aspects such as attach importance to it.
The fourth, Control is the focus of the general subcontractor’s construction organizer, manager's qualification and quality management level, special professional type of work and the key construction technology and new technology, new craft, new material application aspects [3], such as the quality and ability of the operator.
And specific people, materials, and the major factors affecting the quality of construction machinery, methods and environment, needs to start from two aspects of professional technical and management technology, grasp the principle of combining prevention and inspection.
Online since: June 2013
Authors: Zhi Gang Gong, Xiao Ben Ma
It monitors the whole process of sports and covers all factors related to body functions.Thus, the information is presented in a multi-channel and dynamic way, which satisfies the need for scientific fitness and information resources demanded by professional sports teams and sports Research Institute involved in body morphology and functional data management. 
Some basic information reflects the inherent characteristics of individuals, which are relatively stable and strongly objective throughout the whole life. 1.1.1 Demographic information It includes basic information, such as demographic and socio-economic as well as basic health information, such as your name, gender, date of birth, place of birth, nationality, ethnicity. 1.1.2 Training information It means a system of physical exercises or sport training information,for example the training information of professional athletes includes specialized event, length of training, exercise performance, exercise level, sports teams etc; For an ordinary healthy people, you need to know his or her sports event, exercise period, exercise frequency, intensity of exercise etc. 1.1.3 Filing information File information includes date of filing, file management, functional testing, test instrument models etc. 1.2 Body-shaping information 1.2.1 Human morphology It includes shape, fitness, and
It is mainly constituted by fat, water, muscles (proteins) and bones (mineral). 1.2.3 Body functional information Based on the characteristics of sports and research needs, the digital archive of fundamental data and common data elements can be created through cardiovascular function, immune system, endocrine system, oxygen transport system, muscle loading and function of tissue damage, aerobic and anaerobic metabolic function, balance function, sensory function, and so on, thus preparing the establishments of standard classification codes.
Online since: June 2014
This conference has been so designed with the view to provide an opportunity for the scientists, engineers, industrialists, students and other professionals from all over the world to interact and exchange their new ideas and research outcomes for future collaboration.
Jagat Kanwar, Deakin University, Australia Clusters, nanoparticles and water Dr.
Online since: November 2011
Authors: Yu Qian Ying, Jian Gang Lu, Jin Shui Chen, You Xian Sun
In sintering process, mixture of iron ore, coke, limestone and water is deposited by charging bunker on a moving strand to a depth of approximately 700 mm.
Professional engineers of iron ore sintering plant give us lots of valuable advice about how to control the temperature.
In order to simulate the knowledge of these professional and experienced engineers, we build an expert module [5] after PIDNN module to cooperate the control.
Online since: October 2011
Authors: Xin Ge, Wei Guo, Zhi Yang Li
Moreover the ROV control system is so complex that operating ROV becomes a Complicated task.So Non-professionals need extensive training before operating ROV.Even so in the actual training,there are a lot of problems,for example, operators can easily cause damage to the ROV and the cable,and even possible loss of ROV because of operational errors.These problems not only waste a lot of manpower and resources,but also make the training ineffective,and give trained operators enormous psychological burden.In order to reduce the times of sea trials of ROV,and improve the training effect,a ROV training simulator is designed to replace the real ROV.
v)∈R6×6; g(η)—Generated by gravity and buoyancy restoring force (moment) vector, g(η)∈R6×1; τ—Generated by the propulsion force (moment) vector, τ∈R6×1; Coriolis and centripetal force can be ignored as ROV’s speed is relatively low.Because only three degrees of freedom of the displacement and the ROV heading angle are computed,combined with NEROV[8] model parameters, ROV’s dynamic model can be simplified as: Software Design of virtual reality simulation computer After receiving information of ROV’s position and attitude, virtual reality simulation computer will display the movement of ROV in the mrine environment[6].The software tools that we use are Visual Studio 2003 and Vega Prime, which are very easy to achive the function.This software’s flow chart and three-dimensional visual display are as Fig.5 and Fig.6.ROV’s three-dimensional model is shown in Fig.7.The virtual environment introduces the particle system for better display of change of water
Online since: August 2013
Authors: Chen Bin, Yong Zhang, Qian Kun Wang
There are 2-5 design institutes in the design of a subway line, a design unit is divided into different professional (equipment, water supply and drainage, power and lighting, heating ventilation and air conditioning, etc.), the coordination is difficult among various professional and participating units.
Online since: November 2017
Authors: A.S. Benosman, N. Kazi Tani, M.T. Gouasmi, Mohammed Belbachir, Hamed Taïbi
In addition, these materials offer professionals efficient and economically viable technical solutions.
These materials were developed to meet some specific requirements expressed by construction professionals, particularly those relating to acoustic and thermal comfort, and to durability as well.
The gains in mixing water are illustrated in Fig. 3-b.
It allows reducing the quantity of mixing water.
This certainly results in savings on mixing water and increases the workability as well.
Online since: October 2013
Authors: Xiao Dong Li, Wan Cai Xu, Zhou Ya Wang, Cheng Shen
contracting level Technical risks Specification compliance 29 Engineering risks 30 Material and equipment requirement 31 HSE management 32 Construction program Internal resources organization 33 Schedule plan 34 Special program 35 Allocation of managers 36 Choice of construction equipment 37 Project division 38 Contract risks Letter of guarantee 39 Delay responsibility 40 The owner’s termination or assignment responsibility 41 Price adjustment 42 Payment conditions 43 Risk sharing 44 Variation procedure 45 Claim procedure 46 Settlement of dispute 47 Acceptance and transfer of the project 48 Offering risks Scope of offering price 49 Price risks 50 Budget omissions 51 Financial risks Tax risks 52 Financial guarantee 53 Exchange implementation Table1(c) Risk factors of international EPC projects No Risk sources Risk type Risk factors 54 other project participant level Owner Credit of the owner 55 Owner’s financial capital level 56 Agent Agent risks 57 Consultant/ Supervisor/ PM company Professional
standards 58 Professional ethics 59 Division of culture 60 Joint venture partner Credit risks 61 Implementation risks 62 Subcontractor Credit risks 63 Implementation risks 64 Management and control risks market level risks, contracting level risks and other project participant level and the subordinate 16 groups.
Since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 30 feedbacks are sufficient.
Just as stated above, since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 20 feedbacks are sufficient as well.
For example, subgrade construction is to be carried out at the same time with water drainage and safeguard construction, so that when the rainy season comes, the roadway is protected effectively.
Showing 1101 to 1110 of 3745 items