Search results

Online since: December 2016
Authors: Yung Jia Shen, Huaang Youh Hurng
Besides the combination of automatic watering eggs cooling system for hatching process can significantly reduce the required manpower for watering eggs cooling and biosecurity control risk, the average hatching ratio is 82.06% that can satisfy the requirement of general professional goose breeding eggs incubator.
In order to reduce the demand for manpower, the specification of watering system is 1/2” PVC water supply pipes, and four longitudinal pipe designed for the combination of twelve separate ways nozzle totally, the power of belt-type water supply machine is 1HP.
Start from the twelfth day, the automatic eggs cooling system will conduct regular daily automatic cooling and watering.
The fact shows that the automatic watering eggs cooling system is good enough to bear the working requirement.
Automatic watering eggs cooling process start on the twelfth hatching day and conducted at a fixed time every day.
Online since: December 2013
Authors: Hui Dan Lin, Geng Jun Gao
Therefore, this kind of corrosion liquid dangerous goods must be encapsulated in container shipping isolated from the water and inflammable goods.
We should develop standardization of liquid dangerous goods transport ships and series of large tonnage and environmental- friendly ship in inland water.
Relevant departments should combine inland waterway renovation planning for site selection of liquefaction of dangerous goods ship to anchorage in the Yangtze River waterway to establish a professional liquid dangerous goods transport services and ensure the safety of the hazardous carriers.
Existence questions and countermeasures of liquid water transport of dangerous goods [J].
China Water Transport, 2008, (4)
Online since: September 2014
Authors: Mei Tian Wang
The Development of Information Integration System for Oil Production Equipment WANG Meitian 1, a 1 Dongying Vocational College, China a wangmt@163.com Keywords: Information Integration System; Oil Production; Real Time Data Abstract: Oil production equipment has a large amount of information, data acquisition channels, strong professional characteristics, and the data real-time, reliability and consistency of the demand is higher.
Introduction Oil production equipment management involved in the production process of water, electricity, oil, such as production, supply and auxiliary production information management application of it on the steady development of production play a crucial role.
Requirements analysis of the system Structure design of the oil production equipment information integration system Oil production equipment information system with a focus on the production data query, announcement system and communication network platform, data query and public announcement system among secondary units of the implementation of oilfield development system of the production database effectively connected, oil and water Wells of various static and dynamic data query, and the key of oilfield production data in real time announcement; Communication network platform system implementation oilfield development system has the function of internal personnel's online office, including data transmission, work arrangement, equipment management, information management, email, message and notice, etc..
Online since: August 2011
Authors: Xiang Xia, Shi-Kun Xie
To eliminate the used sand to the residual coal dust(FS powder) of the experiment, it is all new sand in experiment, add bentonite, coal dust(FS powder, coal dust+α starch), water, dry mixed 3minutes,wet mixed 8 minutes in molding sand technological condition, then test various properties of molding sand.
Table 1 100 new sand + 8 bentonite + 5 FSpowder +3.0water performance index water content(%) compactability(%) air permeability (pa) green compression strength (kg/cm2) average 3.24 45 130 0.94 performance index shear strength (kpa) untimate deformation (mm) shatter index(%) stabilization of surface(%) average 20 0.73 68.3 98.1 Table 2 100 new sand + 8 bentonite + 5 coal dust +3.0water performance index water content(%) compactability(%) air permeability (pa) green compression strength (kg/cm2) green compression strength (kg/cm2) average 3.24 45 130 0.94 0.94 performance index shear strength (kpa) untimate deformation (mm) shatter index(%) stabilization of surface(%) stabilization of surface(%) average 20 0.73 68.3 98.1 98.1 performance index water content(%) compactability(%) air permeability (pa) green compression strength (kg/cm2) average 3.44 44 120 1.00 performance index shear strength (kpa) untimate deformation (mm) shatter index(%) stabilization of surface
M593 shell ‘s main fault is machinery adhering sand, it’s caused by casting wall thick(compared with other parts), takes much longer for molding sand at high temperature(Also, the environment temperature is very high in summer, large water loss in casting mold, the stability on surface of sand mold is lower).Except raise content of FS powder, lower pouring temperature proper can be used to reduce M593 shell’s adhering sand fault.
Conclusion (1)When water content is 3.0%,compactability can be controlled into 36~45%; (2)The influence of green compression strength, followed by is:5FS powder>(4.5coal dust+0.5αstarch)>5coal dust; (3)The influence of shatter index, followed by is:5FS powder>(4.5coal dust+0.5αstarch)>5coal dust; (4)Adding FS powder can add molding sand ‘s strength and tenacity;compare with adding single coal dust, adding little αstarch also can add molding sand ‘s strength and tenacity on the basis of add coal dust
[2] republic by Chinese mechanical engineering professional societies.
Online since: December 2014
Authors: Gui Bing Wang
The bridge of the chilled anchor head of the pier head problems such as water, severe corrosion ( Fig.3).
In order to ensure that the old and the new cable tensioning, heading anchor tension extension bar adopts the design of professional manufacturers.
Through the design of special tools will slowly old rope down, discharged into the river waiting for professional construction equipment. 3.8 The new Cable Installed and Tension(Fig.7) 3.8.1 Construction Preparation. 1) Check the finished cable; 2) the erection of the main arch stretching platform and welding the main arch temporary suspension points; 3) dealing cable conduit. 3.8.2 Lasso Overall Bridge Deck.
Water Conservancy and Hydropower Science and Technology progress, The Calculation Method of the Initial Tension in arc Bridge [J]. 2000, (6): 32-35.
Online since: April 2022
Authors: Rong Hui Yuan, Guo Bao Zhang, Xi Xi Chen, Hui Hui He, Xiang Yu Ye, Xiao Ying Yan
Formaldehyde (1000 mg L-1) standard solution was stocked in water (Guidechem, China).
Ultrapure deionized H2O with electrical resistivity of 18.2 MΩ cm was prepared with a Milli-Q Integral 5 water purifier (Millipore, USA). 2.2 Size-Controlled Synthesis of C/N-T and Characterizations.
Adnan, Awareness, knowledge and perception of formaldehyde emission from wood composite products among design professionals, Malaysian Forester 84 (2021) 120-136
Online since: February 2012
Authors: Song Jiang Wang, Lei Lin
Table1.Work breakdown structure of the Hsin-an River hydropower project and its risk factors Single project Unit project Item project Risk factor Preparatory construction Land expropriation and immigration (1)Land expropriation funds (2)Resettlement scheme (3)Compensation standards Traffic (1)Environmental damage (2) Construction quality Power supply, water supply and the others construction of line Campsite (1)Construction quality (2)Environmental damage Preparation engineering Diversion channel (1)Geological conditions (2)Hydrologic conditions (3)Construction quality Concrete system Mix concrete on the right bank and Refrigeration system (1)Construction quality (2)Environmental damage Mix concrete on the left bank and Refrigeration system (1)Construction quality (2)Environmental damage Main construction Dam foundation project Dam foundation on the left bank (1)Geological conditions (2)Construction management (3)Construction technology Plant project building project
References [1] Simon, P., Hillson, D. and Newland, K., Project Risk Analysis and Management (PRAM) Guide, Association for Project Management, Ascot-UK, 1997 [2] Boothroyd, C., Emmett, J., Risk Management-A practical guide for construction professionals, Witherby & Co Ltd, London, 1996 [3] Charoenngam C, Yeh CY.Contratual risk and liability sharing in hydropower construction[j].International Journal of Project Management,1999, 17(1):29-37 [4] ZhenQiang Wang, and so on.
The application of Monte Carlo simulation technology in the hydropower project risk analysis, Water resources and hydropower of northeast China, 2003, 21(6): 9-10(In Chinese)
Online since: August 2009
Authors: Min Bai, Xiong Wu, Di Tao Niu
The results will be very useful to the concrete professional dealing with chloride-ion penetration.
In this test, the water binder ratio is equal to 0.45.
Table 1 Concrete mix proportions Concrete Cement [kg/m3] Sand [kg/m3] Crushed stone [kg/m3] Water [kg/m3] Steel fiber [kg/m3] Water reducer [%] PC 367 765 1146 165 0 0.6 SFC-0.5 367 735 1102 165 39 0.6 SFC-1 367 733 1100 165 78 0.6 SFC-1.5 367 718 1066 165 117 0.6 SFC-2 367 702 1053 165 156 0.6 Test Method.
Online since: July 2019
Authors: Aloysio Gomes de Souza Filho, Shama Parveen, Sohel Rana, Romel Dias Vanderlei, Raul Fangueiro
The experimental work was carried out by dispersing MCC in water with the help of a non-ionic surfactant (Pluronic F-127) using ultrasonication energy.
The developed cementitious composites were cured inside water for two different hydration periods, 28 and 56 days.
Natural fibers are a good alternative to synthetic and metallic fibre based reinforcements for engineers, researchers and professionals all over the world because of their superior properties such as high specific strength, low weight, low cost, fairly good mechanical properties, eco-friendly and bio-degradable characteristics as well as local availability of these fibers [4].
Ordinary Portland Cement (CEM I 42.5 R) from Secil-Portugal, standard sand and distilled water were used in a proportion of 0.5:1:3 (water: cement: sand).
For the preparation of each composite; 450 grams of cement, 1350 grams of sand and 225 ml of distilled water were used.
Online since: July 2014
Authors: Zhong Xiao, Lian Cheng Sun, Ting Xu
Study on settlement process of dredger under current force XU Ting1,2 , XIAO Zhong2 ,SUN Liancheng1 1 Tianjin Research Institute for Water Transport Engineering, M.O.T, Tianjin 300456, China 2 Tianjin University, Tianjin, China.
The result from the calculation and analysis of the tidal current in the wreck-zone shows that velocities and directions between ebb-tide and flood tide in the water zone occurs some changes.
The elastic modulus of each soil layer takes 10 times of the compression modulus of the soil layer in the calaulation. 4 Numerical simulations and results 4.1 Current force The current force on the dredger is calculated according to the professional standard of P R China—Load Code for Harbor Engineering (JTJ215-98).
is the density of water, and it is 1.0 for freshwater and 1.025 for seawater.
The current resistance coefficient is CW=2.32×0.7=1.624 (2) According to the relevant tidal current data, the design velocity of current can be taken as 1.5 m/s and the corresponding current force FW is (3) In which, LB is the length of hull bottom surface; LSurf is the length of hull at water surface; h is water depth.