Risk Analysis on Investment of Hydropower Project Based on WBS and RBS

Article Preview

Abstract:

Based on the investment risk characteristics of large-scale hydropower project, the risk identification of investment for hydropower project is investigated according to the project Work Breakdown Structure(WBS) and Risk Breakdown Structure(RBS). The method for estimating the investment risk of hydropower project is applying Monte Carlo simulation technique. This method is applied to analyze the risk of the Hsin-an River hydropower project in the Zhejiang Province based on experts' experiences. Good result is attained.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 468-471)

Pages:

2641-2646

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Simon, P., Hillson, D. and Newland, K., Project Risk Analysis and Management (PRAM) Guide, Association for Project Management, Ascot-UK, (1997)

Google Scholar

[2] Boothroyd, C., Emmett, J., Risk Management-A practical guide for construction professionals, Witherby & Co Ltd, London, (1996)

Google Scholar

[3] Charoenngam C, Yeh CY.Contratual risk and liability sharing in hydropower construction[j].International Journal of Project Management,1999, 17(1):29-37

DOI: 10.1016/s0263-7863(97)00064-1

Google Scholar

[4] ZhenQiang Wang, and so on. Investment risk analysis for large-scale hydropower project, Journal of hydraulic, 2004, 7(7): 92-97 (In Chinese)

Google Scholar

[5] JiKan Pu. The application of Monte Carlo simulation technology in the hydropower project risk analysis, Water resources and hydropower of northeast China, 2003, 21(6): 9-10(In Chinese)

Google Scholar