Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: June 2016
Authors: Jaroslav Smutny, Lubos Pazdera
Among these requirements belong particularly high reliability, low maintenance, great rails resistance against longitudinal displacement and thereby the high level of safety, shock and vibration reduction and easy mounting of fastening system.
Generally it can be noted that each type of rail fastening is necessary to be put under the comprehensive assessment of the appropriateness of the use, taking into account local conditions, such as line speed, curve radius, traffic load, etc.
References to a journal article: [1] A.
Pazdera, New techniques in analysis of dynamic parameters rail fastening, in: InSight, The Journal of The British Institute of Non-Destructive Testing, Vol. 46, No. 10 (2004) 612-615
Smutny, Measurement and Analysis of Dynamic and Acoustic Parameters of Rail Fastening, NDT & E International - Independent Nondestructive Testing and Evaluation, Vol. 37, No. 2 (2004) 119-129.
Generally it can be noted that each type of rail fastening is necessary to be put under the comprehensive assessment of the appropriateness of the use, taking into account local conditions, such as line speed, curve radius, traffic load, etc.
References to a journal article: [1] A.
Pazdera, New techniques in analysis of dynamic parameters rail fastening, in: InSight, The Journal of The British Institute of Non-Destructive Testing, Vol. 46, No. 10 (2004) 612-615
Smutny, Measurement and Analysis of Dynamic and Acoustic Parameters of Rail Fastening, NDT & E International - Independent Nondestructive Testing and Evaluation, Vol. 37, No. 2 (2004) 119-129.
Online since: August 2013
Authors: Gang Yan Li, Han Wei Bao, Jiu Qiang Sun, Hui Zhou
Domestic waste transfer with compression can solve the Less-Than-Payload problem of domestic waste transport, improve carrier efficiency, reduce transfer frequency, save transportation cost, alleviate traffic congestion and eliminate the secondary pollution during transportation.
Tests include manual, semi-automatic and automatic mode test as well as safety program test.
Acknowledgment We would like to give our acknowledgment to Wuhan University of Technology and Wuhan city, Hubei province, China because the research work reported here has been supported by “the Fundamental Research Funds for the Central Universities” (2012-IV-035),“Wuhan City International Science and Technology Cooperation Plan Project of Key Science and Technology Problem Project”(201231234463) and “Wuhan City Youth Science and Technology Chenguang Plan Project”(2013070104010004).
[2] SUN Fenghai, LI Hannan and XU Yumei: The Optimization Design of the Collection and Transportation Management of Municipal Solid Waste, Journal of Shenyang Jianzhu University(Natural Science), Vol. 27(2011), p.942-946
[4] WU Li , et,al: Overall Design of Vertical Compact Waste Transfer Station, Journal of Dalian Jiaotong University, Vol. 33(2012), p.77-80.
Tests include manual, semi-automatic and automatic mode test as well as safety program test.
Acknowledgment We would like to give our acknowledgment to Wuhan University of Technology and Wuhan city, Hubei province, China because the research work reported here has been supported by “the Fundamental Research Funds for the Central Universities” (2012-IV-035),“Wuhan City International Science and Technology Cooperation Plan Project of Key Science and Technology Problem Project”(201231234463) and “Wuhan City Youth Science and Technology Chenguang Plan Project”(2013070104010004).
[2] SUN Fenghai, LI Hannan and XU Yumei: The Optimization Design of the Collection and Transportation Management of Municipal Solid Waste, Journal of Shenyang Jianzhu University(Natural Science), Vol. 27(2011), p.942-946
[4] WU Li , et,al: Overall Design of Vertical Compact Waste Transfer Station, Journal of Dalian Jiaotong University, Vol. 33(2012), p.77-80.
Online since: September 2011
Authors: Yan Xin Lv, Cheng Bo Zhai, Meng Zhang, Xian He Weng, Bao Fu Duan
Introduction
Lai Zhou Power plant, affiliated to Huadian international power, has the planning power capacity of 8×1000MW.
Large cubic metro sliding into pit, forming new safe hazard; 2.Adopting mechanical work and blasting construction, safety condition is poor; 3.
Beijing: people's traffic press, 2009 [3].
Shaanxi qinba to disasters research [J].journal of soil and water conservation research, c. (5) : 20 to 24 [5].
Qinba landslide [J].china journal of geological disasters and prevention, 2009,15 (1) : 112 ~ 117
Large cubic metro sliding into pit, forming new safe hazard; 2.Adopting mechanical work and blasting construction, safety condition is poor; 3.
Beijing: people's traffic press, 2009 [3].
Shaanxi qinba to disasters research [J].journal of soil and water conservation research, c. (5) : 20 to 24 [5].
Qinba landslide [J].china journal of geological disasters and prevention, 2009,15 (1) : 112 ~ 117
Online since: January 2013
Authors: Mustaffar Mushairry, Hamzah Norhaliza, Mazlan Ain Naadia, Ismail Hasrul Haidar, Balarabbe Abubakar Sani, Kian Seng Foo, Marwar Nurfatimah, Abd. Majid Muhd Zaimi, Mohamad Zin Rosli, Zakaria Rozana, Ismail Mohd Affendi, Yazid Yazlin Salfiza
Hsieh and Lin (2004) investigate implementation strategies of ecological construction techniques for different road components, which include slope stabilization, drainage, bridges, tunnels, culverts, railings, lighting, traffic control, service areas, and interchanges [3].
They use 10 assessment items: natural conservation, energy conservation, water/soil conservation, waste reduction, re-vegetation, materials, safety & comfort, fair development, cultural preservation, and cost-effectiveness to perform summary assessments of different types of projects [4].
L., “Introduction to the Promotion Strategies for Ecological Engineering Methods on Roadway Engineering,” 2004 International Conference on Ecological Engineering Methods, Taipei, Taiwan, R.O.C (2004) [3] Huang, R.
Y., “A Study of Promotion Strategies and Outline of the Green Construction Policy,” Research Report of the Public Construction Commission, Executive Yuan, R.O.C. (2002) [4] Yu, C.H., Chen, C.H., Lin, C.F. and Liaw, S.L., “Development of a System Dynamics Model for Sustainable Land Use Management,” Journal of the Chinese Institute of Engineers, Vol. 26, No. 5, pp. 607-618. http://www.astm.org/SNEWS/SO_2008/bryce_so08.html (2002) [5] R.
Journal of the Chinese Institute of Engineers, 31(4):573-585 (2008) [6] T.
They use 10 assessment items: natural conservation, energy conservation, water/soil conservation, waste reduction, re-vegetation, materials, safety & comfort, fair development, cultural preservation, and cost-effectiveness to perform summary assessments of different types of projects [4].
L., “Introduction to the Promotion Strategies for Ecological Engineering Methods on Roadway Engineering,” 2004 International Conference on Ecological Engineering Methods, Taipei, Taiwan, R.O.C (2004) [3] Huang, R.
Y., “A Study of Promotion Strategies and Outline of the Green Construction Policy,” Research Report of the Public Construction Commission, Executive Yuan, R.O.C. (2002) [4] Yu, C.H., Chen, C.H., Lin, C.F. and Liaw, S.L., “Development of a System Dynamics Model for Sustainable Land Use Management,” Journal of the Chinese Institute of Engineers, Vol. 26, No. 5, pp. 607-618. http://www.astm.org/SNEWS/SO_2008/bryce_so08.html (2002) [5] R.
Journal of the Chinese Institute of Engineers, 31(4):573-585 (2008) [6] T.
Online since: July 2014
Authors: Chun You Wu, Lan Lan, Xu Zhao, Feng Ding
Therefore, devoting major efforts to developing green logistics is the inevitable requirement for promoting green economic growth, and also one of the vital indicators of international competitiveness of the country.
(6) Information in time assures assets safely and alerts timely to reduce the loss at traffic accidents and other security problems, (7) Using RFID technology for effective supervision of product in the whole logistics process of products receiving, storage and transportation to arrival points, to realize a responsible management. 4 Current deficiencies in RFID Lacking a uniform standard, and the technology not yet fully mature, major deficiencies of RFID technology are as follows: (1)RFID can only detect the existence of label within the recognition scale, and is unable to obtain the relative positions between the antenna and tag[11].The uncertainty of relative position between the labels and antenna causes a greater error and lowers track effectiveness when locating labels
(2)Safety hazards in information privacy as for RFID technology , especially in long distance transport : ① unauthorized institutions or individuals reads and writes and even illegal tracking information from RFID tag, stealing goods or confidential information in order to pursue its interests or sabotage ② unperfected security mechanisms of RFID tag causes obstacles upon reader services .
Zhengzhou Institute journal of light industry (natural science Edition), 2009, (6): 113-116
Journal of Shandong University, 2011, (5): 26-31
(6) Information in time assures assets safely and alerts timely to reduce the loss at traffic accidents and other security problems, (7) Using RFID technology for effective supervision of product in the whole logistics process of products receiving, storage and transportation to arrival points, to realize a responsible management. 4 Current deficiencies in RFID Lacking a uniform standard, and the technology not yet fully mature, major deficiencies of RFID technology are as follows: (1)RFID can only detect the existence of label within the recognition scale, and is unable to obtain the relative positions between the antenna and tag[11].The uncertainty of relative position between the labels and antenna causes a greater error and lowers track effectiveness when locating labels
(2)Safety hazards in information privacy as for RFID technology , especially in long distance transport : ① unauthorized institutions or individuals reads and writes and even illegal tracking information from RFID tag, stealing goods or confidential information in order to pursue its interests or sabotage ② unperfected security mechanisms of RFID tag causes obstacles upon reader services .
Zhengzhou Institute journal of light industry (natural science Edition), 2009, (6): 113-116
Journal of Shandong University, 2011, (5): 26-31
Online since: July 2014
Authors: Meng Liang Shao
In order to meet the functional requirements, the system needs to achieve the following goals [3-4] :
l The machine starts to support the software user to login and manage to ensure the safety in use;
l Software is adaptive, no manual settings, the teacher can automatically establish a reliable connection to the students, and maintain this connection for transmission to each other;
l The teacher can login to screen the student machine, radio and support electronic pointer, etc;
l The teacher machine and the students machines can perform file transfer;
l The teacher machine can monitor the screens of the students machines, that is the teacher can control the students remotely;
l The teacher and the students machines can send messages to communicate each other;
l The system can be used across platforms.
At the same time, multicast way won't increase the number of nodes on a network segment additional network traffic, so even if the increase in the number of students will not affect the performance of the network and broadcast teaching system, the speed of the client is not limited to the number of students.
Design and implementation of multimedia classroom network central control system : Journal of Jiaozuo University.
Design and Development of Multimedia Network System for eLearning in Nigerian Universities: International Journal of Multimedia and Ubiquitous Engineering (2011)
At the same time, multicast way won't increase the number of nodes on a network segment additional network traffic, so even if the increase in the number of students will not affect the performance of the network and broadcast teaching system, the speed of the client is not limited to the number of students.
Design and implementation of multimedia classroom network central control system : Journal of Jiaozuo University.
Design and Development of Multimedia Network System for eLearning in Nigerian Universities: International Journal of Multimedia and Ubiquitous Engineering (2011)
Online since: July 2014
Authors: Jun Tian, Hong Jie Ni, Ying Sheng Ni
China Safety Science Journal.2004,11(14):25~29
Journal of Chongqing University,2012,(10):124-129 [9] Wei Mingguang,Li Guoping.
China Journal of Highway and Transport, 2002,15(2):61-67 [13] Roschke Paul N,Inoue Masamichi.Effects of banded post-tensioning in pretressed concrete flat slab.Journal of Structural Engneering,1991,117(2):563-583 [14] Xu Dong,Xiang Haifan.
Journal of Southeast University(Natural Science Edition), 2012,42(4):734-738 [16] Standards Council of Canada.CAN/CSA-S6-00 Canadian highway bridge design code.Ontario:CSA International,2000 [17] Nam JW,etal.
International perspective:overview and application of precast bos-beam bridges in Korea.PCI Journal,2008,53(4):83-107 [18] AASHTO.
Journal of Chongqing University,2012,(10):124-129 [9] Wei Mingguang,Li Guoping.
China Journal of Highway and Transport, 2002,15(2):61-67 [13] Roschke Paul N,Inoue Masamichi.Effects of banded post-tensioning in pretressed concrete flat slab.Journal of Structural Engneering,1991,117(2):563-583 [14] Xu Dong,Xiang Haifan.
Journal of Southeast University(Natural Science Edition), 2012,42(4):734-738 [16] Standards Council of Canada.CAN/CSA-S6-00 Canadian highway bridge design code.Ontario:CSA International,2000 [17] Nam JW,etal.
International perspective:overview and application of precast bos-beam bridges in Korea.PCI Journal,2008,53(4):83-107 [18] AASHTO.
Online since: August 2013
Authors: Michael Lazar, John Emery
Its use at Hazrat Shahjalal International airport in Bangladesh on a project for the rehabilitation and extension of 50,000 m2 of aircraft pavements is an indication of a growing confidence in this form of paving.
Other permeable paving systems need wider joints and built-in apertures to increase infiltration through the pavement which may present problems for pedestrian traffic.
For additional safety the use of block paving having extra high interlock is recommended. 4.
Journal of Transportation Engineering.
Proceedings (Volume 1) of the 4th International Conference on concrete block paving – Auckland, New Zealand
Other permeable paving systems need wider joints and built-in apertures to increase infiltration through the pavement which may present problems for pedestrian traffic.
For additional safety the use of block paving having extra high interlock is recommended. 4.
Journal of Transportation Engineering.
Proceedings (Volume 1) of the 4th International Conference on concrete block paving – Auckland, New Zealand
Online since: February 2012
Authors: Song Jiang Wang, Lei Lin
Work breakdown structure of the engineering project
Engineering Project Risk
Politics and environment
·Changes in laws and regulations
·War or civil strife
·License and its approval require-
ments
·Pollution and safety rules
Design
·Unfini- shed design range
·Design alteration
·Error and removing
·Insuffi-
ciency technical order
·Design flaws
Field condition
·Labor disputes and strikes
·Labor efficiency
·Defective work
·Different field conditions
·On-site access
·Equipment failure
Physical
Equipment
is damaged or be stolen
·System is outdated
·Fire hazard and theft
·Casualties
Force majeure
·Weather
·Gale
·Disaster
·Landslide
Earthquake
·Flood
Financial and economic
·Inflation
·if the owners' investment is in place
·Exchange rate fluctuations
·Bid price
·Contractors (subcontractors) breach of contract
Figure2.
Table1.Work breakdown structure of the Hsin-an River hydropower project and its risk factors Single project Unit project Item project Risk factor Preparatory construction Land expropriation and immigration (1)Land expropriation funds (2)Resettlement scheme (3)Compensation standards Traffic (1)Environmental damage (2) Construction quality Power supply, water supply and the others construction of line Campsite (1)Construction quality (2)Environmental damage Preparation engineering Diversion channel (1)Geological conditions (2)Hydrologic conditions (3)Construction quality Concrete system Mix concrete on the right bank and Refrigeration system (1)Construction quality (2)Environmental damage Mix concrete on the left bank and Refrigeration system (1)Construction quality (2)Environmental damage Main construction Dam foundation project Dam foundation on the left bank (1)Geological conditions (2)Construction management (3)Construction technology Plant project building project
References [1] Simon, P., Hillson, D. and Newland, K., Project Risk Analysis and Management (PRAM) Guide, Association for Project Management, Ascot-UK, 1997 [2] Boothroyd, C., Emmett, J., Risk Management-A practical guide for construction professionals, Witherby & Co Ltd, London, 1996 [3] Charoenngam C, Yeh CY.Contratual risk and liability sharing in hydropower construction[j].International Journal of Project Management,1999, 17(1):29-37 [4] ZhenQiang Wang, and so on.
Investment risk analysis for large-scale hydropower project, Journal of hydraulic, 2004, 7(7): 92-97 (In Chinese) [5] JiKan Pu.
Table1.Work breakdown structure of the Hsin-an River hydropower project and its risk factors Single project Unit project Item project Risk factor Preparatory construction Land expropriation and immigration (1)Land expropriation funds (2)Resettlement scheme (3)Compensation standards Traffic (1)Environmental damage (2) Construction quality Power supply, water supply and the others construction of line Campsite (1)Construction quality (2)Environmental damage Preparation engineering Diversion channel (1)Geological conditions (2)Hydrologic conditions (3)Construction quality Concrete system Mix concrete on the right bank and Refrigeration system (1)Construction quality (2)Environmental damage Mix concrete on the left bank and Refrigeration system (1)Construction quality (2)Environmental damage Main construction Dam foundation project Dam foundation on the left bank (1)Geological conditions (2)Construction management (3)Construction technology Plant project building project
References [1] Simon, P., Hillson, D. and Newland, K., Project Risk Analysis and Management (PRAM) Guide, Association for Project Management, Ascot-UK, 1997 [2] Boothroyd, C., Emmett, J., Risk Management-A practical guide for construction professionals, Witherby & Co Ltd, London, 1996 [3] Charoenngam C, Yeh CY.Contratual risk and liability sharing in hydropower construction[j].International Journal of Project Management,1999, 17(1):29-37 [4] ZhenQiang Wang, and so on.
Investment risk analysis for large-scale hydropower project, Journal of hydraulic, 2004, 7(7): 92-97 (In Chinese) [5] JiKan Pu.
Online since: February 2011
Authors: Hua Wang, Jian De Wu, Xiao Dong Wang, Yu Gang Fan
Equipment health diagnosis (including fault detection) and safety assessment;
4).
Huang, Intelligent measurement method of solid traffic in transport of ore pulp pipeline [J].
International Journal of Pressure Vessels and Piping. 2008, 85(4): 228–237
Journal of Petroleum Science and Engineering. 2009, 69(1): 100-106.
Huang, Intelligent measurement method of solid traffic in transport of ore pulp pipeline [J].
International Journal of Pressure Vessels and Piping. 2008, 85(4): 228–237
Journal of Petroleum Science and Engineering. 2009, 69(1): 100-106.