Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: November 2015
Authors: Liliana Luca
Wong, Using an Ishikawa diagram as a tool to assist memory and retrieval of relevant medical cases from the medical literature.
Ionita, Quality management and the engineering of value (in Romanian), ASE Bucharest Publishing, Bucharest, 2008
[11] Cause and Effect Analysis using the Ishikawa Fishbone & 5 Whys, City Process Management, 2008, available at http://www.cityprocessmanagement.com/Downloads/ CPM_5Ys.pdf, accessed: 21.02.2015
Ionita, Quality management and the engineering of value (in Romanian), ASE Bucharest Publishing, Bucharest, 2008
[11] Cause and Effect Analysis using the Ishikawa Fishbone & 5 Whys, City Process Management, 2008, available at http://www.cityprocessmanagement.com/Downloads/ CPM_5Ys.pdf, accessed: 21.02.2015
Online since: June 2013
Authors: Marco D’Avino, Alfredo Bregni, Massimiliano Maria Schiraldi
., Park j. in: A new approach for finite capacity planning in MRP environment, Volume 257/2008, IFIP Advances in Information and Communication Technology (2008)
[3] Zijm w.h.m., Buitenhek r. in: Capacity planning and lead time management, International Journal of Production Economics 46-47 (1996), pp.165-179
[4] Enns s.t. in: MRP performance effects due to forecast bias and demand uncertainty, European Journal of Operational Research 138 (2002), pp. 87-102
[5] Yeung j.h.y., Wong w.c.k. and Ma l. in: Parameters affecting the effectiveness of MRP systems: a review, International Journal of Production Research 36 (1998), pp. 313-331
[6] Hautaniemi p, Pirttila t. in: The choice of replenishment policies in an MRP environment, Int.
Online since: January 2014
Authors: Yuan Ying Qiu, Hong Bo Ma, Ling Hui Kong
[6] S.von Horner, Woon-Ying Wong, Gravitational Deformation and Astigmatism of Tiltable Radio Telescopes, IEEE Transactions on Antennas and Propagation. 23(1975)689-695
[7] Wei Wang, Baoyan Duan, Boyuan Ma, A Method for Panel Adjustment of Large Reflector Antenna Surface and Its Application, Acta Electronica Sinica. 36(2008)1115-1118
[9] CHEN S X, The Analysis, Synthesis and Optimization of Engineering Structure System, China Science Culture Publishing House, China, 2008
[7] Wei Wang, Baoyan Duan, Boyuan Ma, A Method for Panel Adjustment of Large Reflector Antenna Surface and Its Application, Acta Electronica Sinica. 36(2008)1115-1118
[9] CHEN S X, The Analysis, Synthesis and Optimization of Engineering Structure System, China Science Culture Publishing House, China, 2008
Online since: April 2013
Authors: Zhi Bo Cui, You Shan Wang, Sha Sha Jiang, Qiang Liu
Tribological behavior of an elastomer aged in different oils [J].Tribology Internationals, 2008, 41 (9-10): 860-866
[9] Wei Y T, Nasdala L, Rothert H, ital.
World Rubber Industry, 38, 1, 2008 [12] Pacejka, H.
Wong Theory of ground vehicles.3rd ed.2001 [14] Samul K.Clark.
World Rubber Industry, 38, 1, 2008 [12] Pacejka, H.
Wong Theory of ground vehicles.3rd ed.2001 [14] Samul K.Clark.
Online since: March 2015
Authors: C.M. Jiang, J.J. Lu, L.J. Lu
And in Singapore, Yeung & Wong [8] examined 608 road traffic accidents (RTAs) that occurred in the three expressway tunnels over 2009–2011.
References [1] PIARC Technical Committee 3.3 Road Tunnel Operation, 2008.
Risk Analysis for Road Tunnels, May 2008 [2] Kerstin Lemke.
Vol. 15, No. 1, pp. 3-11 [8] Jian Sheng Yeung, Yiik Diew Wong.
Transportation Research Part F 11, 2008 pp.61–74 [11] Lord, D., Mannering, F., 2010.
References [1] PIARC Technical Committee 3.3 Road Tunnel Operation, 2008.
Risk Analysis for Road Tunnels, May 2008 [2] Kerstin Lemke.
Vol. 15, No. 1, pp. 3-11 [8] Jian Sheng Yeung, Yiik Diew Wong.
Transportation Research Part F 11, 2008 pp.61–74 [11] Lord, D., Mannering, F., 2010.
Online since: December 2014
Authors: Jian Hua Zhang, Kai Tuo Shi, Yun Kai Wong
Wind Turbine Failure Rate Calculation Method Considering Multi-Factor Influences
WONG Yunkai1, a, ZHANG Jianhua2, b, SHI Kaituo2, c*
(1Hainan Power Grid Company Haikou 570203 China, 2North China Electric Power University, Beijing 102206, China)
ajc2345@163.com, bjhzhang001@163.com, cshikaituo@163.com
Key Words:multi-factor; wind turbine; failure rate; outage model; real-time reliability
Abstract: In the traditional outage model, the failure rate of the wind turbine is often given as a long-term statistics value on average, that is only one value for a wind turbine, this calculation method is not reflect the real reliability level of wind turbines.
Automation of Electric Power Systems, 2008, 32(3):4-8 [7] Liu Haitao, Cheng Lin, Sun Yuanzhang.
East China Electric Power, 2008, 36(1):81-84 [10] Liu Yang, Zhou Jiaqi.
Automation of Electric Power Systems, 2008, 32(3):4-8 [7] Liu Haitao, Cheng Lin, Sun Yuanzhang.
East China Electric Power, 2008, 36(1):81-84 [10] Liu Yang, Zhou Jiaqi.