Search Options

Sort by:

Sort search results by

Publication Type:

Publication Type filter

Open access:

Publication Date:

Periodicals:

Periodicals filter

Search results

Online since: October 2012
Authors: Ting Hua Xu, Hong Hao Wan
The Application of Table Operations Method in Earthwork Blending Honghao Wan1, a, Tinghua Xu1,b 1College of Civil Engineering, Qingdao Technological University,Qingdao 266000,China amillion99@163.com, bxu-tinghua@163.com Keywords: Earthwork blending, Linear programming, Table operations method, Optimization Abstract.
Conclusions Earthwork blending is widely used in the field of construction engineering, municipal engineering and landscape engineering projects[3].
Of course, when establish the mathematical model of linear programming, we should in accordance with the construction condition, construction procedure and transport conditions to analyze the engineering, and organize optimal construction plan to reduce project costs.
Journal of Construction Engineering and Management[J],2006,(7):750-758
Construction Engineering Assessment [M].
Online since: April 2012
Authors: Rong Jun Su
Study and Analysis on Engineering Feature and Environmental Influence of Coal Mine Rongjun SU * Environmental Engineering Department, Harbin Commerce University, Harbin 150076, China E-mail:surongjun@gmail.com * Corresponding author.
Energy saving measures on every production sections, process flows, equipment and supporting engineering will be taken, thus will reduce consumption of material and energy.
Table 3 The detailed purpose of investment (Unit: million RMB) Engineer name Mine building Civil Equipment & fixxing Other Unpredictable Total Value 3 1.8 3.8 1.7 0.5 10.8 3.2 Raw coal production system The coal produced by this project will be used by local coal separating plant and steel company.
There will no infrastructure removing engineering after expiration of the project.
[2] Environmental Engineering Assessment Center of State Environmental Protection Administration: Techological Guidance and Standard of Environment Impact Assessment.
Online since: February 2011
Authors: Bao Lin Xiong, Chun Jiao Lu
Journal of Geotechnical Engineering, 1993, 119(9):1462-1479
Soil Dynamics and Earthquake Engineering, 1996, 15(7):419-429
Fuzzy sets and structural engineering.
Earthquake engineering and engineering vibration, 1988, 8(3):48-56
Earthquake engineering and engineering vibration, 1989, 9(4):82-91.
Online since: May 2011
Authors: Rong Ji Li, Hui Fang Shen, Jun Ying Guo
Introduction City building construction is now increasingly extending to soft soil bases as more and more harbor, subway, industry and civil buildings has been and will be constructed in the fast development of city infrastructures.
Soft soil base being a special engineering kind, inappropriate handling will easily result in accidents.
From Table 1 the Zhejiang soft soil engineering quality can be inferred as follows: High Natural Water Content.
Its engineering geological quality is defined through mathematical statistics analyses based on numerous soft soil PM indexes.
Beijing: China Engineering Construction Press, 1992.
Online since: November 2013
Authors: Hong Guang Ji, Zhang Hua Chen, Ping Shi
A new method for analysis on geo-stress field fitting Ping Shi 1,2a, Zhang-hua Chen 1b, Hong-guang Ji 3c 1 School of Mathematics and Physics,University of Science and Technology Beijing,Beijing 100083,China, 2 School of science, Beijing University of Civil Engineering and Architecture,Beijing 100044,China, 3 School of Civil and Environmental Engineering,University of Science and Technology Beijing,Beijing 100083,China asp@bucea.edu.cn, b chenzhanghua@ustb.edu.cn, c jihongguang@ces.ustb.edu.cn Keywords: partial least squares; geo-stress field; correlation; regression analysis Abstract.
In mining engineering, in order to obtain data of underground geotechnical material and the stress distribution, sampling and measuring buried points under ground must be carried out.
Engineering geophysical journal, 2011, 8(6): 767 [2] Yuan H P, Zhao K, Wang J L, et al.
Non-ferrous metal science and engineering, 2011, 2(1): 59 [3] Zhang Y H, Wei Q, Sheng Q, et al.
Geotechnical engineering, 2011, 32(5): 1523 [4] Wang H W, et al.
Online since: June 2022
Authors: Tebogo Mashifana
GBFS has been used as general-purpose construction sand in civil engineering applications and as an excellent select fill behind reinforced earth walls [11-12].
Doğan-Sağlamtimur: Advances in Civil Engineering, (2018)
Rashad: Journal of Building Engineering, 5 (2016), p.119-141
Hanif: Journal of Building Engineering, 33 (2021), p.101641
Komnitsas2011: Procedia Engineering, 21 (2011), p.1023-1032
Online since: August 2013
Authors: You Zhi Wang, Meng Ting Niu, Bo Liu
Risk analysis and control in the Yellow River-crossing tunnel of South-to-North Water Diversion East Line LIU Bo a, WANG You-zhi b, NIU Meng-ting c School of Civil Engineering, Shandong University, Ji'nan 250061, China a75257931@qq.com, b wangyouzhi@sdu.edu.cn, c 365683574@qq.com Key Words: South-to-North Water Diversion; Yellow River-crossing Tunnel; Life-cycle; Risk control Abstract: The life-cycle of the Yellow River-crossing tunnel is divided into six stages, including planning, design, bidding, construction, operation, maintenance, and disposal.
Risk control: In addition to conventional measures, individual projects with greater risk are selected to purchase insurance according to current insurance system of domestic engineering and related engineering insurance experience.Combined with the characteristics of the Yellow River engineering,the employer and contractor each purchased engineering insurance.
Risk control: Measures in this stage to deal with risks include reasonably practicable scheme argumentation and design,research on the engineering properties of the packing materials, numerical analysis on rationality of the construction and model tests.After the stuffing engineering, the risk of the Yellow River burst should be reduced to minimum. 4 Conclusion The life-cycle of the Yellow River-crossing tunnel is divided into six stages, including planning, design, bidding, construction, operation, maintenance, and disposal.
The preliminary design report of the Yellow River-crossing engineering project of the the first phase of the South-to-North Water Diversion East Line(revised) [R].Tianjing: Zhong Shui North Survey and Design Co., Ltd., 2006
The survey and design of Yellow River-crossing engineering of the eastern route of South-to-North Water Transfer.
Online since: October 2021
Authors: Bahia Rabehi, Sabria Malika Mansour, Youcef Ghernouti
Precast self-compacting concrete members have been increasingly utilized in civil engineering construction in recent years due to their advantages: reliable quality assurance, simple production process, faster construction speed, and environmentally friendly building operations.
Boumcheddaa, Strength and compressive behaviour of ultra high-performance fibre-reinforced concrete (UHPFRC) incorporating Algerian calcined clays as pozzolanic materials and silica fume, European Journal of Environmental and Civil Engineering. 17 (8) (2013) 599–615, http://dx.doi.org/10.1080/19648189.2013.802998
Billong, Activité pouzzolanique des déchets de briques et tuiles cuites, African Journal of Science and Technology (AJST), Science and Engineering Series, 5(1) (2004), 92–100
Benmalek, Acceleration of the Hardening of Concrete Made with Mineral Admixtures by Using a Heat Treatment Process, Advances in Materials Science and Engineering. 4 (2014) 164–171
Aqel, Steam Cured Self-Consolidating Concrete and the Effects of Limestone Filler, thesis submitted in conformity with the requirements for the degree of Doctor of Philosophy., Department of Civil Engineering University of Toronto 2016.
Online since: December 2023
Authors: Aref A. Abadel
Abadel1,a,* 1Department of Civil Engineering, College of Engineering, King Saud University, 11421, Riyadh, Saudi Arabia aaabadel@ksu.edu.sa Keywords: UHPGC, recycled fine aggregate, eco-friendly material, mechanical properties, water absorption.
The outcomes of this study can promote sustainable construction practices by reducing the reliance on virgin materials and promoting the circular economy within the civil engineering industry.
PLoS One 18:1–31. https://doi.org/10.1371/journal.pone.0282435 [6] Althoey F, Zaid O, Alsulamy S, et al (2023) Determining engineering properties of ultra-high-performance fiber-reinforced geopolymer concrete modified with different waste materials.
Online since: March 2012
Authors: De Qiang Zhou
Introduction This paper involves the problem that the solution representative is that the community help an item engineering task.The advantage makes use of a community help the item is in this realm of the consistency technique provided a kind of means, the representative looked like to solve space, not singlely ordered a solution.This engineer provided the foundation of a better decision and even lifted high-efficiency excellent turn calculate way to used for the solution that the source orders, because it helps the calculate way to concentrate to these solution that the space may imply in the searching of regions.In this aspect, we put forward a following new method.
Solve constraint-satisfaction problem by backtracking method The partial consistency technique reformed to control the value combination of satisfying the cancellation inconformity of problem from second change to measure, and result of combine a refined and variable area to be called label.This conversion the one step complete, namely it can't loosen a solution.This fine label to in response to a consideration problem that looks like solution space.In the engineering task, it can be very important to know having a solution space for looking like at least: In the traditional method, the engineering task solves an use of some excellent turn a method to provide list the result of the point.This may cause artificial conflict, the different engineer participates in an item[2].In this case, the engineer will provide the solution of sub- problem of an one them don't know other participation solutions.When the son combines in the item in the whole scope, conflict may appear.The method of
Because the consistency of the region not only is a worthy input to search calculate way(such as excellent turn a method), but it also in aid of can see the space of turning the solution.A visual help engineer finds out to compromise the circumstance conflict at the artificial, and support them at the decision.The consistency of the region provided the foundation strategy while working out an engineering problem thus.
Conclusion The correct formulation of local techniques provide useful support engineering task many interdependent variables are discrete and digital participation.
References [1] Lottaz, C Cle ment, humorous, D, Faltings, B, Smith.Constraint-based support for collaboration in design and construction[J].Computing and Civil Engineering, 1999,13(1),23-35