Risk Analysis and Control in the Yellow River-Crossing Tunnel of South-to-North Water Diversion East Line

Article Preview

Abstract:

The life-cycle of the Yellow River-crossing tunnel is divided into six stages, including planning, design, bidding, construction, operation,maintenance, and disposal. To ensure the safety of the tunnel during various stages, the concept of life-cycle risk management is introduced. The article identified the risks in all stages and proposed corresponding measures for risk controlling, some of which were already applied in the project and achieved good effect.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2655-2658

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LIU Ning. Scheme Demonstration and Confirmation of Cross-Yellow River Project of the East Route of the South-to-North Water Transfer Project [J]. South-to-North Water Transfers and Water Science & Technology, 2008, 6( 2) : 1-7.

DOI: 10.3724/sp.j.1201.2011.01021

Google Scholar

[2] Zhong Shui North Survey and Design Co., Ltd. The preliminary design report of the Yellow River-crossing engineering project of the the first phase of the South-to-North Water Diversion East Line(revised) [R]. Tianjing: Zhong Shui North Survey and Design Co., Ltd., (2006).

DOI: 10.3724/sp.j.1201.2011.01021

Google Scholar

[3] LI Ying. Research on Risk Management of Hydroelectric Investigation and Design Project Based on Full Life-Cycle: [ Master's degree paper]. Beijing: North China Electric Power University, (2010).

Google Scholar

[4] LIU De-tang. The survey and design of Yellow River-crossing engineering of the eastern route of South-to-North Water Transfer. [J]. Haihe Water Resources, 2000, 5: 25-26.

Google Scholar