Engineering Project Risk Interpretation Structure Model Building and Analysis

Article Preview

Abstract:

The rapid development of construction engineering brings profit, but it also brings risks we only for engineering project risk correctly understanding, objective evaluation, can reasonably and control the negative effect of the risk based on the ISM principle, choose the project risk, use the method of reachability matrix and the various factors construction engineering project risk factors explain structure model, through the various risks of progressive relationship between, and puts forward the managers should be based on different factors influence degree to differentiate between, and find out the root cause, this paper focuses on the analysis and control of the main project risk.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2640-2644

Citation:

Online since:

August 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Qi Anbang, Project risk management, Tian jin, NJ: Nankai University Press, 2010. 211-224.

Google Scholar

[2] Hu Keke, Engineering project risk management and early warning research. Master's dissertation, Univ. Xinjiang Agricultural University, Urumqi, Xinjiang, (2006).

Google Scholar

[3] Zhang Yubo, Engineering project risk management research, Silicon Valley, vol. 2, no. 2, p.85, (2011).

Google Scholar

[4] Fei Xiaoyan, Based on the interpretation structure model of electronic commerce project risk analysis, China Management Informationization, vol. 13, no. 24, pp.69-72. Dec, (2010).

Google Scholar

[5] Qiao Ming, Risk management analysis of project management, Construction & Design for Project, vol. 12, no. 12, pp.28-31, (2003).

Google Scholar

[6] He Jiangbo, The cause of the theory of project risk and its hedging mechanism, Studies in dialectics of nature, vol. 26, no. 2, pp.62-67, Feb, (2010).

Google Scholar

[7] Zhong Zhiqiang, Explain the structure model algorithm research, Computer studies, vol. 1, no. 1, pp.2-3, Feb, (2009).

Google Scholar

[8] Zhu Lin, Lv Benfu, Explain the structure model of the simple method, Systems Engineering and Electronics, vol. 26, no. 12, pp.1815-1817, Dec, (2004).

Google Scholar

[9] Ying Jinda, Factors of construction engineering project risk management and prevention, Management & technology of SME, vol. 7, no. 15, pp.57-57, (2011).

Google Scholar

[10] Li Guijun, Zhang Yuesong, From risk management to uncertainty management: a significant change in project management, Journal of harbin institute of technology, vol. 13, no. 3, pp.369-373, (2006).

Google Scholar

[11] Yang Caixia, Xu Yu, Study of Multistage Project Risk Identification-Assessment Process Based on Objective Orientation, Journal of Xiamen University, Vol. 41, Sup., pp.342-243, Oct, (2002).

Google Scholar

[12] He Xinhua, Hu Wenfa, An evaluation model for political risks of projects in international context, Journal of Tongji university, Vol. 35, No. 11, pp.1572-1577, Nov. (2007).

Google Scholar

[13] Xiao Limin, Construction of international project contracting risk early warning system, Journal of harbin institute of technology, vol. 38, no. 12, pp.2129-2131, Dec, (2006).

Google Scholar

[14] Shen Jianming, Project risk management, Beijing, NJ: China Machine Press, (2004).

Google Scholar

[15] Liu Jin, Project risk management case study and analysis, Silicon Valley, vol. 2, no. 2, p.83, (2010).

Google Scholar