Study on Process Optimization of Design Phase Based on BIM in China

Article Preview

Abstract:

The development of BIM in China is still at the primary stage. The scope of application is mainly limited within the design phase and building a three-dimension model (3D), which is far away from what is expected. Based on the present situation, the paper analyzes the application process of BIM at the design phase, and puts forward the reason for optimizing the design process, then builds the new design process.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2671-2675

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Smyth H., in: Construction Management and Economics. 28(2010), pp.255-270.

Google Scholar

[2] Information on http: /www. wbdg. org/pdfs/NBIMSv1_p1. pdf8.

Google Scholar

[3] Zhiliang Ma, in: Information technology. (2010), pp.12-15(In Chinese).

Google Scholar

[4] Yang Zhang, in: Theory and key issues of the construction of integrated BIM-based projects. Tongji University (2010)(In Chinese).

Google Scholar

[5] Jianxin Zhang, in: Research on Engineering Management. 24 (2010), pp.387-392(In Chinese).

Google Scholar

[6] Autodesk, Building Information Modeling for Sustainable Design, Autodesk REVIT White Paper(2005).

Google Scholar

[7] Yujun Chen, Yulong Liu, in: information technology. (2010), pp.26-29(In Chinese).

Google Scholar