Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: May 2012
Authors: Zong Qiang Zhu, Zhang Liao, Ligewa Qi, Qi Jin Yuan, Li Ming Tang
Introduction
Water shortages and water pollution are two major problems all over the world.
Primary pollutant substance of livestock waste and domestic sewage are organic, nitrogen, phosphorus and other substances, grey water recycling can be widely used for urban greening, industrial cooling water, environment water, ground water and irrigation water.
But it also has some disadvantages: (1) the high investment and operating costs; (2) complex technology, requires professional management; (3) collection of sludge disposal problems; (4) domestic evaluation system does not have the appropriate industry standards and technique evaluation system.
East water western tune and south water to north every year in our country, much water is lost on the way to transport water.
They are mainly used to wash the toilet water, cooling water and wash green ground factory.
Primary pollutant substance of livestock waste and domestic sewage are organic, nitrogen, phosphorus and other substances, grey water recycling can be widely used for urban greening, industrial cooling water, environment water, ground water and irrigation water.
But it also has some disadvantages: (1) the high investment and operating costs; (2) complex technology, requires professional management; (3) collection of sludge disposal problems; (4) domestic evaluation system does not have the appropriate industry standards and technique evaluation system.
East water western tune and south water to north every year in our country, much water is lost on the way to transport water.
They are mainly used to wash the toilet water, cooling water and wash green ground factory.
Online since: November 2012
Authors: Xin Gang Song, Ning Zhang, Qiang Ma
Professional qualities and skills of engineers need to be reinforced and we ought to conquer the anthropogenic factors.
The water supply section of the auxiliary boiler employs the method of dual control intermittent adjustment to keep the boiler water in the range of the setting water level.
The water source is mainly the water condensed by condenser or water coming from out of the system directly.
All steam forms steam-water mixture after heat exchange, and then it flows through the condenser in water subsystem to become water and flows to hot well to form the source of make-up water in boiler.
In consequence, we accomplish the circulation of from water to steam and then steam to water to fulfill the heating tasks.
The water supply section of the auxiliary boiler employs the method of dual control intermittent adjustment to keep the boiler water in the range of the setting water level.
The water source is mainly the water condensed by condenser or water coming from out of the system directly.
All steam forms steam-water mixture after heat exchange, and then it flows through the condenser in water subsystem to become water and flows to hot well to form the source of make-up water in boiler.
In consequence, we accomplish the circulation of from water to steam and then steam to water to fulfill the heating tasks.
Online since: September 2013
Authors: Zhong Ming Ren, Dai Zhong Su
The environmental impact indicators considered in the software include carbon footprints, water eutrophication, air acidification and energy.
Unfortunately, the results only shows carbon footprints, water eutrophication, air acidification and energy, which may be not detailed enough for application in further design optimisation.
It provides a professional tool to collect, analyse and monitor the environmental impact of products and services.
Solidworks can only define product via CAD modelling which is time consuming and complex work requiring professional knowledge, so it gets only one star in product definition character.
Unfortunately, the results only shows carbon footprints, water eutrophication, air acidification and energy, which may be not detailed enough for application in further design optimisation.
It provides a professional tool to collect, analyse and monitor the environmental impact of products and services.
Solidworks can only define product via CAD modelling which is time consuming and complex work requiring professional knowledge, so it gets only one star in product definition character.
Online since: March 2013
Authors: Tong Qing Wu, Nian Chun Xu, Lin Qing Huang
Each experimental teaching plan with different majors and gradually arrange experimental content, set up experimental course with different levels, and form multi-level experimental teaching system with different distinctiveness according to characteristics of professional discipline and developing trend of experiment teaching.
For example, it remains typical testes such as density test, water content test and adds triaxial comprehension test in the soil experimental teaching.
In the soil experiment, it can achieve sorts of experimental comprehension of water ratio, density, classification and compaction of soil, test students the degree of mastering theoretical knowledge by taking advantage of index formula of physic property to calculate and judgment ability to time condition of site soil.
Optimize the structure of experimental teaching staff team gradually; improve the professional quality of experimental personnel in order to ensure the level of experimental teaching and quality of experimental teaching.
For example, it remains typical testes such as density test, water content test and adds triaxial comprehension test in the soil experimental teaching.
In the soil experiment, it can achieve sorts of experimental comprehension of water ratio, density, classification and compaction of soil, test students the degree of mastering theoretical knowledge by taking advantage of index formula of physic property to calculate and judgment ability to time condition of site soil.
Optimize the structure of experimental teaching staff team gradually; improve the professional quality of experimental personnel in order to ensure the level of experimental teaching and quality of experimental teaching.
Online since: August 2013
Authors: Jun Li Liu, Ji Cheng Liu, Ye Li
Table 1
SWOT analysis on offshore wind industry of China
advantage()
disadvantage()
no land occupation()
lack of professional()
close to power load center()
offshore wind resource evaluation is non-standard()
inside
China master offshore wind construction core technology()
lack of supporting construction of grid()
offshore wind resource is abundant and high quality()
lack of core technology of wind turbine()
energy saving and low carbon()
offshore wind industry is not perfect()
Relatively mature technology and high cost-effective()
relatively higher cost to traditional energy()
opportunity()
threaten()
external competition promote development()
powerful international manufacturers lead to fierce competition()
outside
China’s offshore wind power development plan()
lack of coordinate between manufacturer and grid()
China’s offshore wind power development policy()
excess capacity of China’s manufacturer()
international Clean Development Mechanism()
Advantage analysis
No land
Offshore shallow waters has potential resource about 500 million kw.
Disadvantage analysis Lack of professional.
Offshore wind station’s cost is mostly attributed to water depth and distance from shore[6].
Offshore shallow waters has potential resource about 500 million kw.
Disadvantage analysis Lack of professional.
Offshore wind station’s cost is mostly attributed to water depth and distance from shore[6].
Online since: August 2013
Authors: Yong Gui He, Yan Zi Li
The market share of China’s solar water heater has been far more than 40% in 2010, the annual production of solar photovoltaic cells accounts for about 1/4 of the world, ranking 3rd in the world.
Third, enhance independent research and development of core technology of new energy, and pay attention to the development of technical professionals, playing technology innovation capability which based on circular economy.
References [1] Kai Jiang and Meiying Yang: Water Resources and Power Vol. 01 (2010), p. 151-154+53 [2] Yonggui He: The theory of Gradient regional circular economy and the new energy strategy research (China Quality Press, China 2012)
Third, enhance independent research and development of core technology of new energy, and pay attention to the development of technical professionals, playing technology innovation capability which based on circular economy.
References [1] Kai Jiang and Meiying Yang: Water Resources and Power Vol. 01 (2010), p. 151-154+53 [2] Yonggui He: The theory of Gradient regional circular economy and the new energy strategy research (China Quality Press, China 2012)
Online since: October 2012
Authors: Xing Nong Zhang, Chang Ying Chen, Dong Dong Jia
It can be seen that such bank collapse, mostly occurred in water-break or dry period, easily formed in the reach where poor resistance of bank soil to erosion and big water level difference between flood and low water is, for example many reaches of the middle Yangtze River.
Such collapses, occurred mostly in flood and median water period, easily formed in the reach where deep water and high speed current is.
To monitor soil mechanics properties and seepage parameters, some inbuilt professional instruments should be provided.
There may be large seepage intensity in the bank due to fast drawdown of river water level and heavy rain.
(in Chinese) [5] Dong Zeren, Practical techniques in levee emergency rescue, edtied by China Water Power Press, Beijing (1999).
Such collapses, occurred mostly in flood and median water period, easily formed in the reach where deep water and high speed current is.
To monitor soil mechanics properties and seepage parameters, some inbuilt professional instruments should be provided.
There may be large seepage intensity in the bank due to fast drawdown of river water level and heavy rain.
(in Chinese) [5] Dong Zeren, Practical techniques in levee emergency rescue, edtied by China Water Power Press, Beijing (1999).
Online since: October 2014
Authors: Biao Gao
In view of the audit team members, the enterprise invited experts about cleaner production to teach professional knowledge and skills of cleaner production auditing, so that the members of the audit team could master the necessary knowledge and skills of cleaner production auditing.
Such as pulping section cylinder washing water, dust water of boiler water film etc. (2) the main raw material cost increased year by year.
Water resources had not been fully utilized and the repeated use of water rate was low Management and operation Factors 1.
Reusing slurry concentration white water of garden network; 2.
Deinking use white water; 3.Using white water jump sieve; 4.
Such as pulping section cylinder washing water, dust water of boiler water film etc. (2) the main raw material cost increased year by year.
Water resources had not been fully utilized and the repeated use of water rate was low Management and operation Factors 1.
Reusing slurry concentration white water of garden network; 2.
Deinking use white water; 3.Using white water jump sieve; 4.
Online since: March 2013
Authors: Jian Yu Chu, Dan Xiang Ma
power supply, emergency sewage, emergency toilet, emergency refuse disposal, emergency evacuation road and emergency signs
Standard for Planning of Town
emergency earthquake evacuation site
emergency power supply, emergency water supply
Emergency shelters in Taiwan
mid-term and long-term asylum
emergency power supply, emergency water supply, health and bathing facilities, firewater, broadcasting and generation facility
temporary refuge shelter and temporary asylum
emergency power supply, emergency water supply, health and bathing facilities, firewater, broadcasting, generation facility and lighting
emergency congregate shelter
firewater
Disaster Prevention Park’s Planning and Design Guide, Disaster Prevention Park Technology Epitome
central disasters prevention park
emergency tank, emergency well, waterscape facility, sprinkling facility, broadcasting, communication, signs, lighting, generation facility, emergency materials reserve and emergency command
fixed disasters prevention
Among them, the rescue team is composed by professional emergency repair mission responsible for disaster relief, medical rescue, fire fighting, anti-epidemic, communications and security and so on.
Emergency materials reserve provides much-needed drinking water, food, tents, clothing and medicine.
Emergency infrastructure are to protect the refugees basic living which including water supply (storage tank, emergency wells, water features facilities and water purification equipment), power supply (power transformation facilities and power generation equipment), lighting (emergency lighting and portable lighting equipment), sewage, communication, evacuation roads, vehicle parking and helicopter apron (for the seriously injured transit and goods transport) etc.
In Chinese [4] Tianying Zhou, Furen Jian: Research of Soil and Water Conservation, Vol.8, No.1, Mar., 2001:17-23.
Among them, the rescue team is composed by professional emergency repair mission responsible for disaster relief, medical rescue, fire fighting, anti-epidemic, communications and security and so on.
Emergency materials reserve provides much-needed drinking water, food, tents, clothing and medicine.
Emergency infrastructure are to protect the refugees basic living which including water supply (storage tank, emergency wells, water features facilities and water purification equipment), power supply (power transformation facilities and power generation equipment), lighting (emergency lighting and portable lighting equipment), sewage, communication, evacuation roads, vehicle parking and helicopter apron (for the seriously injured transit and goods transport) etc.
In Chinese [4] Tianying Zhou, Furen Jian: Research of Soil and Water Conservation, Vol.8, No.1, Mar., 2001:17-23.
Online since: June 2013
Authors: Jie Liu, Chang Yi Jin
EPKS C300 SYSTEM
1.1 Hardware and Structure of EPKS C300
EPKS C300 process controlling system is the latest autonomous system produced by Honeywell, with Windows 2000 Professional as its operation system.
Quite to the opposite, too lower drum level will fasten the speed of water vaporization due to little water and heavy load in the boiler drum.
As a result of severe change of water quantity, normal circulation between drum and water is going to be affected.
If it is not timely controlled, all water in the drum will be vaporized, water circulation will be totally ruined.
In the process of control on boiler, the main level was level of water while the auxiliary ones were steam load and water supply flow.
Quite to the opposite, too lower drum level will fasten the speed of water vaporization due to little water and heavy load in the boiler drum.
As a result of severe change of water quantity, normal circulation between drum and water is going to be affected.
If it is not timely controlled, all water in the drum will be vaporized, water circulation will be totally ruined.
In the process of control on boiler, the main level was level of water while the auxiliary ones were steam load and water supply flow.