Research on Applications of EPKS C300 System to Steam Turbine and Boiler

Article Preview

Abstract:

A new HONEWELL process controlling system, namely EPKS C300, was systematically introduced. Applications of the system to 7# steam turbine and 9# boiler in the Baling Petrochemical Thermal Power Division and some important controlling strategies have been briefly investigated. EPKS C300 was used for the technical reform of the steam turbine and boiler. SCM sequence control, drum level three impulse control and DEH system modification were implemented on the boiler. With the help of FSSS system, furnace safety monitoring, automatic speed regulation of steam turbine unit, load automatic control and main steam pressure automatic control were realized.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 706-708)

Pages:

1511-1515

Citation:

Online since:

June 2013

Authors:

Keywords:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Xiao-hui, Yang Su-rong, Di Jiang-bo, Zhang Wen-shuai, The Application of PVC device in Honeywell EPKS C200 system, Qinghai Science and Technology (Nov. 2, 2009): 71-88

Google Scholar

[2] Le Jia-qian Instrument Operating Manual (Jul, 2003): 32-51, Chemical Industry Press

Google Scholar

[3] Liang En-quan, Ju Lin-cang, Ou Wei, Introduction to PKS system by Hollysys Company, Instrument User (Nov. 2004)

Google Scholar

[4] Li Jian-jun, Guang Chun-yu, The Application of Transformation of Unit Thermal Automation in 300 MW DC Boiler [J] (Oct., 2003), Northeast Electric Power Technology Press

Google Scholar