Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: July 2012
Authors: Yin Feng Xu, Xiong Wan, Qun Di Yu, Wei La Li, Xiao Kun OuYang, Li Ye Yang
Technol Vol.6 (2010), p.89
[5]N.Wang, C.H.Liang and D.L.Yu Industrial Water Treatment Vol.7 (2009), p.31
[6]H.C.Yun Environ Chem Vol.30 (2011), p.517
[7]J.J.Yin ang X.Y.Xiong Agro-processing Vol.211 (2010), p.4
[8]D.P.Tian, Z.Y.Wang and L.Li Resource development and marketing Vol.26 (2010), p.903
[9]T.J.Ling,Y.Chen,Z.Jiang Resource development and marketing Vol.3(2010),p.119
[10]Q.X.Yao and X.H.Yang Liaoning Shihua University Vol.30 (2010), p.19
[11]J.X.Li,J.K.Wang and X.W.Kang Food Processing Vol.4(2011),p.70
Online since: October 2011
Authors: Chun Yu Wei, Ming Xing Song
Usually this bridge is composed of the bridge, corridor and the kiosk. [3] (Fig 2)
(3) Chong Tian Lou (Towering Building)
Chong Tian Lou is like a loft built between the two patios.
(Fig12) (5) The design of Tian Ma Comprehensive Teaching Building of Hunan University: By using the difference of the terrain, we created a vertical well and slit space, which solved the big problem of ventilation and sunlight at little cost.
[2] Yang Shenchu.
(Fig12) (5) The design of Tian Ma Comprehensive Teaching Building of Hunan University: By using the difference of the terrain, we created a vertical well and slit space, which solved the big problem of ventilation and sunlight at little cost.
[2] Yang Shenchu.
Online since: November 2012
Authors: Guang Wen Ma, Yan Ye, Yuan Bo Zhang
Tian lin-gang [22] using fuzzy clustering analysis method to evalue the reservoir safety of Jiangyou after Wenchuan earthquake
Resour Res , 1980,16(2),p.275-283 [7] Dong Wang; Yuansheng Zhu, Review and Expectation of Application of Risk Analysis to Water Resource Systems, Journal of Hehai University (Natural Sciences ), Vol.30 No2,2002, pp.71–74 [8] Yuying Xu, Bende Wang, Risk Analysis for Reservoir Flood Forecasting System, Hydrology, Vol.21 No2,2001, pp.1–4 [9] Bende Wang; Yuying Xu, Analysis of Risk for Reservoir Flood Standard, Hydrology, Vol.21 No6,2001, pp.8–10 [10] Bangke Song, Yuying Xu, Study on risk analysis method for automatic measure and forecast system of reservoir rain regime, Water Resourse & Hydropower of Northeast China, Vol19 No3,2001,p.22,35-36 [11] Bende Wang, Guohua Liang, Chuntian Cheng ,Real-time Risk Operation Model and Its Application for Flood Control, Hydrology, Vol20 No6,2000,p.4-8 [12] Ping Feng, Genfu Chen, Enfu Ji, RISK ANALYSIS OF WATER STORAGE OVER LIMIT WATER LEVEL DURING FLOOD SEASON IN GANGNAN RESERVOIR, JOURNAL OF TIANJIN UNIVERSITY,1995(4),p. 572~576 [13] Fengwei Tian
Natural Sciences ), Vol.29 No2,2001, pp.71-74 [15] Qiang Huang; Longde Miao; Zengfa Wang, Analysis and Decision Methods for the Risk in Reservoir Operation, JOURNAL OF XI AN UNIVERSITY OF TECHNOLOGY, Vol.15 No.4 ,1999,pp.6-10 [16] Shuhai Jiang, Application of stochastic differential equations in risk analysis for flood relief, JOURNAL OF HYDRAULIC ENGINEERING, 1994(3),pp.94-103 [17] Shuhai Jiang, The assessment and check of dam safety for flood prevention, JOURNAL OF HYDRAULIC ENGINEERING, 1998(1),pp.18-24 [18] Zhuxing Xu, zizhong Guo,Risk calculation of open-type spillway, JOURNAL OF HYDRAULIC ENGINEERING, 1989(4) ,pp.50-54 [19] Xiangyuan Chu,Hydraulic model of uncertainty, JOURNAL OF HYDRAULIC ENGINEERING, 1992(5),pp.33~38 [20] Daoxi Wang, Reservoir safety design and collapse risk, ADVANCES IN SCIENCE AND TECHNOLOGY OF WATER RESOURCES, 1995 (1),pp. 17~24 [21] Changxing Wang, Huiming Wang, Comparison of flood risk calculation methods ,water power,1996 (12),pp. 13~16 [22] Lingang Tian
, Yang Li,Fuzzy Cluster Analysis in earthquake risk assessment of reservoir, Yellow River,2010 (1) ,pp.130~131 [23] Changming Ji,Liping Wang,Shangyou Feng.Multiobjective risk analysis in a key water control project management[J].Modelling,Measurement & Control,France,1994 (4) ,pp.47~56 [24] Yangbo Chen Biqiu Zeng,Multi-objective optimization model and its application for reservoir operation considering water supply and power generation, Yangtze River,2004(4),pp.11-14
Resour Res , 1980,16(2),p.275-283 [7] Dong Wang; Yuansheng Zhu, Review and Expectation of Application of Risk Analysis to Water Resource Systems, Journal of Hehai University (Natural Sciences ), Vol.30 No2,2002, pp.71–74 [8] Yuying Xu, Bende Wang, Risk Analysis for Reservoir Flood Forecasting System, Hydrology, Vol.21 No2,2001, pp.1–4 [9] Bende Wang; Yuying Xu, Analysis of Risk for Reservoir Flood Standard, Hydrology, Vol.21 No6,2001, pp.8–10 [10] Bangke Song, Yuying Xu, Study on risk analysis method for automatic measure and forecast system of reservoir rain regime, Water Resourse & Hydropower of Northeast China, Vol19 No3,2001,p.22,35-36 [11] Bende Wang, Guohua Liang, Chuntian Cheng ,Real-time Risk Operation Model and Its Application for Flood Control, Hydrology, Vol20 No6,2000,p.4-8 [12] Ping Feng, Genfu Chen, Enfu Ji, RISK ANALYSIS OF WATER STORAGE OVER LIMIT WATER LEVEL DURING FLOOD SEASON IN GANGNAN RESERVOIR, JOURNAL OF TIANJIN UNIVERSITY,1995(4),p. 572~576 [13] Fengwei Tian
Natural Sciences ), Vol.29 No2,2001, pp.71-74 [15] Qiang Huang; Longde Miao; Zengfa Wang, Analysis and Decision Methods for the Risk in Reservoir Operation, JOURNAL OF XI AN UNIVERSITY OF TECHNOLOGY, Vol.15 No.4 ,1999,pp.6-10 [16] Shuhai Jiang, Application of stochastic differential equations in risk analysis for flood relief, JOURNAL OF HYDRAULIC ENGINEERING, 1994(3),pp.94-103 [17] Shuhai Jiang, The assessment and check of dam safety for flood prevention, JOURNAL OF HYDRAULIC ENGINEERING, 1998(1),pp.18-24 [18] Zhuxing Xu, zizhong Guo,Risk calculation of open-type spillway, JOURNAL OF HYDRAULIC ENGINEERING, 1989(4) ,pp.50-54 [19] Xiangyuan Chu,Hydraulic model of uncertainty, JOURNAL OF HYDRAULIC ENGINEERING, 1992(5),pp.33~38 [20] Daoxi Wang, Reservoir safety design and collapse risk, ADVANCES IN SCIENCE AND TECHNOLOGY OF WATER RESOURCES, 1995 (1),pp. 17~24 [21] Changxing Wang, Huiming Wang, Comparison of flood risk calculation methods ,water power,1996 (12),pp. 13~16 [22] Lingang Tian
, Yang Li,Fuzzy Cluster Analysis in earthquake risk assessment of reservoir, Yellow River,2010 (1) ,pp.130~131 [23] Changming Ji,Liping Wang,Shangyou Feng.Multiobjective risk analysis in a key water control project management[J].Modelling,Measurement & Control,France,1994 (4) ,pp.47~56 [24] Yangbo Chen Biqiu Zeng,Multi-objective optimization model and its application for reservoir operation considering water supply and power generation, Yangtze River,2004(4),pp.11-14
Online since: October 2006
Authors: Li Kai Shi, Li Jun Xie, Bi Cheng Yang, Zhi Feng Zhang, Jun Xu
Thixoforming and Industrial Application of the Semi-Solid
Alloy Al-6Si-2Mg
Lijun Xie, Jun Xu, Bicheng Yang, Zhifeng Zhang, Likai Shi
General Research Institute for Non-ferrous Metals(GRINM), No.2 Xinjiekou Wai St.
Tian and L.
Tian and L.
Online since: February 2011
Authors: Wan Ramli Wan Daud, Edy Herianto Majlan, Zahira Yaakob, Samaneh Shahgaldi, Dariush Jafar Khadem
References
[1] Yang RT.
B, 2005, 109 (23), pp 11525–11529 [12] Jun Chen, Suo-Long Li, Zhan-Liang Tao, Yu-Tian Shen, and Chun-Xiang Cui, J.
[14] Si Cheng, Dezhi Shen, Xinsheng Zhu, Xingguang Tian, Dongying Zhou, Li-Juan Fan, European Polymer Journal 45 (2009) 2767–2778 [15] Wnek GE, Carr ME, Simpson DG, Bowlin GL.
[17] Yan Hana, Yijing Wang, , Yaping Wang, Lifang Jiao, and Huatang Yuan ,j hydrogen energy, vol 35, 2010 ,issue 15, 8177-8181 [18] Kim C, Yang KS.
B, 2005, 109 (23), pp 11525–11529 [12] Jun Chen, Suo-Long Li, Zhan-Liang Tao, Yu-Tian Shen, and Chun-Xiang Cui, J.
[14] Si Cheng, Dezhi Shen, Xinsheng Zhu, Xingguang Tian, Dongying Zhou, Li-Juan Fan, European Polymer Journal 45 (2009) 2767–2778 [15] Wnek GE, Carr ME, Simpson DG, Bowlin GL.
[17] Yan Hana, Yijing Wang, , Yaping Wang, Lifang Jiao, and Huatang Yuan ,j hydrogen energy, vol 35, 2010 ,issue 15, 8177-8181 [18] Kim C, Yang KS.