Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: July 2011
Authors: Rui Jun Liu, Sheng Wu Yu
Performance Test Bench Development of Auto Transmission Control Mechanism
Yu Shengwu1, a, Liu Ruijun2,b
1,2College of Traffic &Civil Engineering Beihua University Jilin China
a yushengwu_0@163.com, b tjuliuruijun@163.com
Keywords: Auto, transmission control mechanism, test bench, test
Abstract.
Automotive Engineering, 2010, 32 (3): 223-227
Automotive Engineering, 2008, 30 (11): 975-978
Automotive Engineering, 2010, 32 (1): 56-59
A piecewise hole filling algorithm in reverse engineering[J].
Automotive Engineering, 2010, 32 (3): 223-227
Automotive Engineering, 2008, 30 (11): 975-978
Automotive Engineering, 2010, 32 (1): 56-59
A piecewise hole filling algorithm in reverse engineering[J].
Online since: May 2011
Authors: Yuan Suo, Jian Feng Li, Li Jiao Xu, Yue Shen
Material Price Risks Impact on Project Costs Research
Jianfeng Lia, Yue Shenb, Lijiao Xuc and Yuan Suod
School of Civil Engineering, Chang An University, No. 161 Chang An Road, Xi'an city, Shaanxi Province, China
alilaoshi1956@163.com, bshen1986yue@126.com, cxulijiao_1314@163.com, dsuoyuanhao@163.com
Key words: BOQ; Bidding Control Price; risk; GM (1, 1); Grey Forecasting Model
Abstract.
Table 1 Calculation program of Bidding Control Price number Fees Name computing formula 1 Sub-segment cost of Quantities Quantity ×Integrated Unit Price 2 measure costs Quantity ×Integrated Unit Price&1×rate 3 Other project costs Tentative amount+ Provisional valuation of professional engineering+ dataller + Contract service fees 4 set-fee (1+2+3) ×rate 5 tax (1+2+3+4) ×rate 6 Bidding Control Price 1+2+3+4+5 Table 1 tells us that Integrated Unit Price is the main factor which affects the Bidding Control Price.Therefore, how to determine the Integrated Unit Price turns into the first important issue, and also the main target of this study.
Table 6 Integrated Unit Price Analysis Table (by the risk 3.84%) unit: Yuan code Project Name unit quantity Labor costs material cost Machinery costs risk operation cost profit Integrated Unit Price 010416001001 reinforcing steel (Diameter less than 10mm) t 10.00 728.28 3667.82 42.19 140.84 233.99 149.69 4962.82 4-6 round steel withinΦ10 t 10.00 728.28 3667.82 42.19 140.84 233.99 149.69 risk=3667.82×3.84%=140.84 operation cost= (728.28+3667.82+42.19+140.84) ×5.11 %( rate) =233.99 profit=(728.28+3667.82+42.19+140.84+233.99)×3.11%(rate)= 149.69 This case adopt the Construction Engineering Wastage Quota and Reference Rate in Shaanxi province Table 7 Integrated Unit Price Analysis Table (by the risk 5%) unit: Yuan code Project Name unit quantity Labor costs material cost Machinery costs Risk operation cost profit Integrated Unit Price 010416001001 reinforcing steel (Diameter less than 10mm) t 10.00 728.28 3667.82 42.19 183.39 236.17 151.08
5008.93 4-6 round steel withinΦ10 t 10.00 728.28 3667.82 42.19 183.39 236.17 151.08 risk=3667.82×5%=183.39 operation cost= (728.28+3667.82+42.19+183.39) ×5.11 %( rate) = 236.17 profit= (728.28+3667.82+42.19+183.39+233.99) ×3.11 % (rate) =151.08 This case adopt the Construction Engineering Wastage Quota and Reference Rate in Shaanxi province Comparing the above two examples we can find that the Integrated Unit Price of reinforcing steel (Diameter less than 10mm) saves (5008.93-4962.82) = 46.11 (Yuan) if we use the risk predicted by gray theory.
The value of risk predicted by gray theory can change as different duration of projects and actual situations, so it is more in line with engineering practice and the project can receive more reasonable price.
Table 1 Calculation program of Bidding Control Price number Fees Name computing formula 1 Sub-segment cost of Quantities Quantity ×Integrated Unit Price 2 measure costs Quantity ×Integrated Unit Price&1×rate 3 Other project costs Tentative amount+ Provisional valuation of professional engineering+ dataller + Contract service fees 4 set-fee (1+2+3) ×rate 5 tax (1+2+3+4) ×rate 6 Bidding Control Price 1+2+3+4+5 Table 1 tells us that Integrated Unit Price is the main factor which affects the Bidding Control Price.Therefore, how to determine the Integrated Unit Price turns into the first important issue, and also the main target of this study.
Table 6 Integrated Unit Price Analysis Table (by the risk 3.84%) unit: Yuan code Project Name unit quantity Labor costs material cost Machinery costs risk operation cost profit Integrated Unit Price 010416001001 reinforcing steel (Diameter less than 10mm) t 10.00 728.28 3667.82 42.19 140.84 233.99 149.69 4962.82 4-6 round steel withinΦ10 t 10.00 728.28 3667.82 42.19 140.84 233.99 149.69 risk=3667.82×3.84%=140.84 operation cost= (728.28+3667.82+42.19+140.84) ×5.11 %( rate) =233.99 profit=(728.28+3667.82+42.19+140.84+233.99)×3.11%(rate)= 149.69 This case adopt the Construction Engineering Wastage Quota and Reference Rate in Shaanxi province Table 7 Integrated Unit Price Analysis Table (by the risk 5%) unit: Yuan code Project Name unit quantity Labor costs material cost Machinery costs Risk operation cost profit Integrated Unit Price 010416001001 reinforcing steel (Diameter less than 10mm) t 10.00 728.28 3667.82 42.19 183.39 236.17 151.08
5008.93 4-6 round steel withinΦ10 t 10.00 728.28 3667.82 42.19 183.39 236.17 151.08 risk=3667.82×5%=183.39 operation cost= (728.28+3667.82+42.19+183.39) ×5.11 %( rate) = 236.17 profit= (728.28+3667.82+42.19+183.39+233.99) ×3.11 % (rate) =151.08 This case adopt the Construction Engineering Wastage Quota and Reference Rate in Shaanxi province Comparing the above two examples we can find that the Integrated Unit Price of reinforcing steel (Diameter less than 10mm) saves (5008.93-4962.82) = 46.11 (Yuan) if we use the risk predicted by gray theory.
The value of risk predicted by gray theory can change as different duration of projects and actual situations, so it is more in line with engineering practice and the project can receive more reasonable price.
Online since: December 2010
Authors: Wen Liang Qiu, Le Zhou, Yu Zhang
Nonlinear Seismic Behaviors of Girder Bridge with Single-Column Pier
Wenliang QiuPa, Le zhoubb and Yu ZhangPc
School of Civil Engineering, Dalian University of Technology, Dalian 116024, P.
Duan: Bridge Engineering Handbook, CRC press LLC ( 1999)
Journal of Structural Engineering, ASCE Vol. 26 (8)(2000):869-878
Journal of earthquake engineering and engineering vibration Vol. 26(3)(2006): 70-73.
Duan: Bridge Engineering Handbook, CRC press LLC ( 1999)
Journal of Structural Engineering, ASCE Vol. 26 (8)(2000):869-878
Journal of earthquake engineering and engineering vibration Vol. 26(3)(2006): 70-73.
Online since: August 2011
Authors: Zhao Jun Ren, Bin Wang, Xia Zhao, Xiao Wen Bian, Jian Guo Li, Wei Liu
Systematization Education Discussion and Application Research of Architecture Major in Higher Education
Wang bin , Zhao xia , Bian xiaowen, Li jianguo ,Ren zhaojun,Liu wei
Institute of Civil Engineering, Binzhou Polytechnic, China Shandong
wangbin112233@yeah.net
Keywords: Education platform, Education mode, Higher education, Architecture.
Introduction In the present higher education, architecture major is mainly open based on society requirement that include architecture engineering, construction supervision, construction costs, engineering management, real estate management and analyze the major groups.
In the second semester, core center course should be engineering construction.
Research in higher education of engineering, 2004,(03)
Introduction In the present higher education, architecture major is mainly open based on society requirement that include architecture engineering, construction supervision, construction costs, engineering management, real estate management and analyze the major groups.
In the second semester, core center course should be engineering construction.
Research in higher education of engineering, 2004,(03)
Online since: July 2013
Authors: Shi Hang Huang, Hui Ruan, Ying Zhang, De Peng Dang
Place
Meaning
Transition
Meaning
p1
Beginning of rescue
t1
Start to rescue
p2
End of rescue
t2
Judge persons dead or not
p3
Sufferer
t3
Determine identities of dead persons
p4
Dead
t4
Rescue affected persons
p5
Not dead
t5
Protect personnel security
p6
Classification of identify
t6
Civil protection
p7
Identify of sufferer
t7
Dispose the bodies
p8
Have been hurt
t8
Treat the injured persons
p9
Not be hurt
t9
Translate to other Places
p10
The heal methods
t10
Recovered
p11
End of first aid
t11
Follow-up treatments
p12
End of treatment
Isomorphic Markov chain.According to the Stochastic Petri net established for the emergency procedure, we convert it to an isomorphic Markov chain.
Research on Ontology-based Emergency Response Plan Template, Computer Engineering, 2006, 32(19),170-172
IEEE transactions on automation science and engineering EI SCI, 2009, 6(1)
Evaluation of the Teaching Effect of Construction Engineering Cost Software Based on the Markov Chain.International Conference on Intelligent System Design and Engineering Application,2012
Capacitated stochastic colored Petri net-based approach for computing twoterminal reliability of multi-state network.Systems Engineering and Electronics,2012, 23(2),304-313.
Research on Ontology-based Emergency Response Plan Template, Computer Engineering, 2006, 32(19),170-172
IEEE transactions on automation science and engineering EI SCI, 2009, 6(1)
Evaluation of the Teaching Effect of Construction Engineering Cost Software Based on the Markov Chain.International Conference on Intelligent System Design and Engineering Application,2012
Capacitated stochastic colored Petri net-based approach for computing twoterminal reliability of multi-state network.Systems Engineering and Electronics,2012, 23(2),304-313.
Online since: December 2013
Authors: Shuang Jian Jiao, Qun Le Du, Long Fei Li
Research of Carbon Emissions of Highway Operation Period Based on Grey Relational Analysis
Shuangjian Jiao1,a,Longfei Li1,b,Qunle Du2,c
1College of Engineering, Ocean University of China, China
2Highway Administration Bureau of the Department of Transport of Hebei province, China
ajiaoouc@126.com, blilongfei2003@163.com, cdduqunle@sina.com
Keywords: Highway; Route indicators; Carbon emissions; Grey relational analysis
Abstract: The CO2 emissions of highway transportation industry are huge.
Acknowledgment Thank strongly for the support of civil engineering laboratory involving ocean of engineering institute of Ocean University of China exceedingly.
[6] Shuangjian Jiao, Chengcheng Hou, Yanwei Li, Establishing the CO2 emission model of carbon neutral road based on gradient[C].2011 International Conference on Electrical and Control Engineering (ICECE),2011,Vol.5:4494-4497. in Chinese
[9] JShuangjian Jiao, Chengcheng Hou, Qunle Du, The Research of Carbon Absorbing Ability of Road Greening Plants in North China[C]. 2011 International Conference on Electrical and Control Engineering (ICECE),2011,Vol.6:5598-5601. in Chinese.
Acknowledgment Thank strongly for the support of civil engineering laboratory involving ocean of engineering institute of Ocean University of China exceedingly.
[6] Shuangjian Jiao, Chengcheng Hou, Yanwei Li, Establishing the CO2 emission model of carbon neutral road based on gradient[C].2011 International Conference on Electrical and Control Engineering (ICECE),2011,Vol.5:4494-4497. in Chinese
[9] JShuangjian Jiao, Chengcheng Hou, Qunle Du, The Research of Carbon Absorbing Ability of Road Greening Plants in North China[C]. 2011 International Conference on Electrical and Control Engineering (ICECE),2011,Vol.6:5598-5601. in Chinese.
Online since: December 2013
Authors: Hai Xing Yang, Bo Liang, Zu De Ding, Hui Ming Zhao, Jing Cao
Study on Synchronized Grouting Pressure to Segments of Shallow EPB Shield Tunnel
Haixing Yang1,a, Jing Cao1,b, Bo Liang1,2, Zude Ding1, Huiming Zhao1
1Faculty of Civil Engineering and Mechanics, Kunming University of Science and Technology, Kunming, 650500, China.
2Kunming Metro Construction Management Co.Ltd, Kunming, 650011, China.
To sum up, the synchronous grouting pressure should be set at a reasonable range that neither less than minimum control pressure nor more than the maximum control pressure, namely: (12) The case study Engineering situation An engineering practice of urban rail transit in Kunming is at the length of 2917.5m and the tunnel mileage started from ICK30 +805 to ICK33 +555.31. open-cut construction method was applied to ICK30+805~ICK300+900,and the section of ICK30+900~ICK33+555.31 was constructed by shield driven method with the diameter of 6.2m.
Mechanism and Determination of Parameters of Synchronous Grouting in shield tunneling, Chinese Journal of Underground Space and Engineering 2007, 4(1):130-133
Mechanism of backfill grouting in shield tunneling and its effect on the surrounding environment Journal of Disaster Prevention and Mitigation Engineering,2010,30:299~304 [4] Yun L.H.
To sum up, the synchronous grouting pressure should be set at a reasonable range that neither less than minimum control pressure nor more than the maximum control pressure, namely: (12) The case study Engineering situation An engineering practice of urban rail transit in Kunming is at the length of 2917.5m and the tunnel mileage started from ICK30 +805 to ICK33 +555.31. open-cut construction method was applied to ICK30+805~ICK300+900,and the section of ICK30+900~ICK33+555.31 was constructed by shield driven method with the diameter of 6.2m.
Mechanism and Determination of Parameters of Synchronous Grouting in shield tunneling, Chinese Journal of Underground Space and Engineering 2007, 4(1):130-133
Mechanism of backfill grouting in shield tunneling and its effect on the surrounding environment Journal of Disaster Prevention and Mitigation Engineering,2010,30:299~304 [4] Yun L.H.
Online since: August 2024
Authors: Petcherdchoo Aruz, Punthutaecha Koonnamas
Petcherdchoo: Advances in Materials Science and Engineering Vol. 2018 (2018), 2793481
Ahmed: Engineering Structures Vol. 245 (2021), 112879
[13] Japan Society of Civil Engineers (JSCE), in: Standard specification for concrete structures-2002, Structural Performance, JSEC Guidelines for Concrete (2003)
Jang: Applied Science and Engineering Progress Vol. 13(2) (2020), p. 127-135
Petcherdchoo: Advances in Materials Science and Engineering Vol. 2021 (2021), 6905802.
Ahmed: Engineering Structures Vol. 245 (2021), 112879
[13] Japan Society of Civil Engineers (JSCE), in: Standard specification for concrete structures-2002, Structural Performance, JSEC Guidelines for Concrete (2003)
Jang: Applied Science and Engineering Progress Vol. 13(2) (2020), p. 127-135
Petcherdchoo: Advances in Materials Science and Engineering Vol. 2021 (2021), 6905802.
Online since: September 2017
Authors: Adam Konvalinka, Alexander N. Kravcov, Vladimir A. Vinnikov, Ivan A. Shibaev, Elmira A. Ertuganova, Pavel N. Ivanov
Ivanov2,f
1Department of Construction Technology, Faculty of Civil Engineering in Prague,
Thákurova 7/2077, 166 29 Prague 6 - Dejvice, Czech Republic
2The National University of Science and Technology “MISiS”,
Leninsky pr.6, Moscow, 119991 Russia
akravtale@fsv.cvut.cz, badam.konvalinka@fsv.cvut.cz, cevgeny.vinnikov@gmail.com, dassistent@mail.ru, emrdfyz@mail.ru, fpasha-19951995@mail.ru
Keywords: Grain size, broadband ultrasonic spectroscopy, marble samples, diffraction, attenuation
Abstract.
Journal of Rock Mechanics and Geotechnical Engineering, Volume 8, Issue 1, February 2016, Pages 35-49
Journal of Rock Mechanics and Geotechnical Engineering.
Key Engineering Materials.
Key Engineering Materials.
Journal of Rock Mechanics and Geotechnical Engineering, Volume 8, Issue 1, February 2016, Pages 35-49
Journal of Rock Mechanics and Geotechnical Engineering.
Key Engineering Materials.
Key Engineering Materials.
Online since: May 2012
Authors: Yao Qing Gong, Yun Gong, Zhen Yan Xiao
Free Vibration Analysis for Step Tubular Structures of Tall Buildings Supported on Elastic Foundation Soil
Xiao Zhenyan1,a, Gong Yun2,b, * and Gong Yaoqing1,c
1 School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454003, China
2 General Affair and Construction Department, Jiaozuo Teachers College, 454002, China
axzyhpu@163.com, bgongyun1@163.com, cgongyq@hpu.edu.cn
Keywords: Tall Building Structure.
Many researchers engaging in structural engineering have devoted to investigating the dynamic properties of various structural systems of tall buildings by means of their free vibration analyses.
Jeary: Free Vibration Analysis of Cantilevered Tall Structures Under Various Axial Loads, Engineering Structures 22 (2000) 525–534
Zielinski: Static And Dynamic Analysis of Tall Tube-In-Tube Structures by Finite Story Method, Engineering Structures, Vol. 18, No. 7, pp. 515-527, 1996
Chinese: Formulation of Equivalent Stiffness for Semi-Infinite Elastic Subgrade And Its Application, Engineering Mechanics 2007; 5: 10-16
Many researchers engaging in structural engineering have devoted to investigating the dynamic properties of various structural systems of tall buildings by means of their free vibration analyses.
Jeary: Free Vibration Analysis of Cantilevered Tall Structures Under Various Axial Loads, Engineering Structures 22 (2000) 525–534
Zielinski: Static And Dynamic Analysis of Tall Tube-In-Tube Structures by Finite Story Method, Engineering Structures, Vol. 18, No. 7, pp. 515-527, 1996
Chinese: Formulation of Equivalent Stiffness for Semi-Infinite Elastic Subgrade And Its Application, Engineering Mechanics 2007; 5: 10-16