Authors: Bao Rong Huo, Xiang Dong Zhang
Axial Compression Test and Capacity Caculation of RC Columns Consolidation with BFRP, CFRP
Baorong HUO 1,2,a, Xiangdong ZHANG 2,b
1.College of Architectural and Engineering ,Shenyang University, P.R.China, 110044
2.
College of Civil Engineering and Traffic, Liaoning Technical University, P.R.China 123000 aweizengkui888@163.com,bzhxd2008@yahoo.com.cn Keywords: BFRP, CFRP, Reinforced concrete (RC) column , Axial compression, Ductility .
Comparative test of RC columns bound with BFRP, CFRP is conducted with monotonic loading effect and the effects on capacity, ductility, strain of reinforcement are studyed. it is of great significance on improving the theory of the fiber composite material reinforcing RC and better guiding the engineering practice.
Journal of Civil Engineering,2002,35(3):13-19
College of Civil Engineering and Traffic, Liaoning Technical University, P.R.China 123000 aweizengkui888@163.com,bzhxd2008@yahoo.com.cn Keywords: BFRP, CFRP, Reinforced concrete (RC) column , Axial compression, Ductility .
Comparative test of RC columns bound with BFRP, CFRP is conducted with monotonic loading effect and the effects on capacity, ductility, strain of reinforcement are studyed. it is of great significance on improving the theory of the fiber composite material reinforcing RC and better guiding the engineering practice.
Journal of Civil Engineering,2002,35(3):13-19
Online since: October 2012
Authors: Yong Quan Zhu, Su Min Zhang
Management Criterion for Large Deformation Tunnels
ZHANG Sumin 1,2,a ,Zhu Yongquan 2,b
1School of Civil Engineering, Southwest Jiaotong University,Chengdu,China
2 School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang,China
azsm6337@stdu.edu.cn ,b7935526@163.com
Keywords: Tunnel, Large deflection, Limit displacement, Deforming rate, Management criterion
Abstract.The limit displacement was calculated with regard to a large deflection tunnel.
References [1].Zhu.Y.Q,Zhang.S.M,Jing.S.T.: Chinese Journal of Rock Mechanics and Engineering .24, 1594 (2005) [2].Zhang.S.M.
:Chinese Journal of Rock Mechanics and Engineering.25, 1502 (2006)
References [1].Zhu.Y.Q,Zhang.S.M,Jing.S.T.: Chinese Journal of Rock Mechanics and Engineering .24, 1594 (2005) [2].Zhang.S.M.
:Chinese Journal of Rock Mechanics and Engineering.25, 1502 (2006)
Online since: July 2014
Authors: Yong Mei Qian, Xue Wen Xie, Da Peng Zhao
Introduction
Because the formula of the bearing capacity of single pile of the PEMUR pile is not mature, it is usually determined by static loading test, the empirical formula, combined with the empirical parametric method or other comprehensive estimation method in practical engineering.
Journal of Jilin Architecture and Civil Engineering Institute in June 2004 [2] Y.M.
Journal of Jilin Architecture and Civil Engineering Institute in June 2010 [3] Y.M.
The Geotechnical Engineering in December 2003 [4] Y.M.
Journal of Jilin Architecture and Civil Engineering Institute in June 2004 [2] Y.M.
Journal of Jilin Architecture and Civil Engineering Institute in June 2010 [3] Y.M.
The Geotechnical Engineering in December 2003 [4] Y.M.
Online since: March 2013
Authors: Ke Dong Guo, Chun Min Dong
Experiment research on square columns reinforced
by high strength wire mesh mortar
Dong Chunmin a, Guo Kedong b
School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454000, P.R.
[2] H.Zhao and M.N.S.Hadi: Procedia Engineering.
[4] Alessandra Marini and Alberto Meda: Engineering Structures.
[5] Ouyang Yu, Huang Yihui and Qian Zaizi: China Civil Engineering Journal.
[2] H.Zhao and M.N.S.Hadi: Procedia Engineering.
[4] Alessandra Marini and Alberto Meda: Engineering Structures.
[5] Ouyang Yu, Huang Yihui and Qian Zaizi: China Civil Engineering Journal.
Online since: September 2014
Authors: Fabiane Salles Ferro, Francisco Antonio Rocco Lahr, André Luis Christoforo, Luciano Donizeti Varanda, Amós Magalhães de Souza, Fabrício Moura Dias
Rocco Lahr 4,f
1 Department of Materials, School of Engineering of São Carlos, University of São Paulo – USP, Avenue Trabalhador São-carlense, 400, Center, zip code 13566-590, São Carlos, SP, Brazil.
2 Department of Civil Engineering, University Center Eastern Minas Gerais – UnilesteMG, Av.
Avenue Tancredo Neves, 3500 , neighborhood Universitário zip code: 35170-056, Coronel Fabriciano, MG, Brazil. 3 Department of Civil Engineering, Federal University of São Carlos - UFSCar.
Washington Luís highway, km 235 – SP 310, Guanabara garden, zip code 13565-905, São Carlos, SP, Brazil. 4 Department of Structure, School of Engineering of São Carlos, University of São Paulo – USP, Avenue Trabalhador São-carlense, 400, Center, zip code 13566-590, São Carlos, SP, Brazil.
Avenue Tancredo Neves, 3500 , neighborhood Universitário zip code: 35170-056, Coronel Fabriciano, MG, Brazil. 3 Department of Civil Engineering, Federal University of São Carlos - UFSCar.
Washington Luís highway, km 235 – SP 310, Guanabara garden, zip code 13565-905, São Carlos, SP, Brazil. 4 Department of Structure, School of Engineering of São Carlos, University of São Paulo – USP, Avenue Trabalhador São-carlense, 400, Center, zip code 13566-590, São Carlos, SP, Brazil.
Online since: May 2011
Authors: Jian Song, Jin Song Zhu
Study on Time-variant Robustness Assessment Method of Complex Bridges
Jinsong Zhu1,2,a, Jian Song1,b
1School of Civil Engineering, Tianjin University, Tianjin 300072, China
2Key Laboratory of Coast Civil Structure Safety (Tianjin University), Ministry of Education, Tianjin 300072, China
ajszhu@tju.edu.cn, bsongjian053@163.com
Key words: complex bridge, time-variant robustness, degradation of member section properties, assessment method.
M., in: Bridge Maintenance, Safety, Management and Life-Cycle Optimization 2010, p2466 [2] Michel Ghosn and Fred Moses: Structure and Infrastructure Engineering.
M. and Klisinski, M: Journal of Structural Engineering.
M.: Structure and Infrastructure Engineering.
M., in: Bridge Maintenance, Safety, Management and Life-Cycle Optimization 2010, p2466 [2] Michel Ghosn and Fred Moses: Structure and Infrastructure Engineering.
M. and Klisinski, M: Journal of Structural Engineering.
M.: Structure and Infrastructure Engineering.
Online since: September 2011
Authors: Hong Xiang, Jing Hai Zhou
Research on Mechanical Properties of Recycled Fiber Concrete
Jinghai Zhou1, a, Hong Xiang2,b
1Low Carben City and Green Building Designing Institution, Shenyang Jianzhu University, Shenyang, Liaoning, 110168, China
2School of Civil Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, 110168, China
a476088880@qq.com, bxianghong1984@126.com
Keywords: carpet waste, recycled fiber, concrete, mechanical properties.
Sun, A.Q Shen: South Highway Engineering, 2006,31(3): 75-77.
Tang: Civil Engineering Joural, 2005,38(7): 5.
Yi: China Municipal Engineering, 2010, NO.6: 6-7.
Sun, A.Q Shen: South Highway Engineering, 2006,31(3): 75-77.
Tang: Civil Engineering Joural, 2005,38(7): 5.
Yi: China Municipal Engineering, 2010, NO.6: 6-7.
Online since: January 2014
Authors: Michal Kraus, Darja Kubečková
Diagnostics of Current Developments in the Field of Building Airtightness
Michal Kraus1, a and Darja Kubečková1, b
1 VŠB-Technical University of Ostrava, Faculty of Civil Engineering; Ludvíka Podéště 1875/17, 708 33 Ostrava, Czech Republic
amichal.kraus@vsb.cz, bdarja.kubeckova@vsb.cz
Keywords: Airtightness, air permeability, sustainability, energy performance, SWOT.
During the design phase it is necessary to coordinate the designer with the other team members (structural engineer, MEP engineers, and technologists).
Kubečková: Airtightness of Energy Efficient Buildings, in: 1st Annual International Conference on Architecture and Civil Engineering.
During the design phase it is necessary to coordinate the designer with the other team members (structural engineer, MEP engineers, and technologists).
Kubečková: Airtightness of Energy Efficient Buildings, in: 1st Annual International Conference on Architecture and Civil Engineering.
Online since: September 2013
Authors: Yong Li, Chao Hui Pan, Lin Feng Yin, Gan Tang
Optimization Research on the Bolt Arrangement of a Double-Wall Steel Insulation Silo with Multiple Bolted Joint
Gan Tang1,2,a, Chaohui Pan1,b, Linfeng Yin2 and Yong Li1
1 Department of Civil Engineering, Nanjing University of Aeronautics and Astronautics,
YuDao Street 29, Nanjing, China, 210016
2 School of Civil Engineering, Southeast University, SiPaiLou 2, Nanjing, China, 210096
atanggan@sina.com (corresponding author),bpanchaohui1990@sina.com
Keywords: Steel insulation silo, double-wall, optimization, bolt simulation, bolt arrangement
Abstract.
Więckowski: The material point method in large strain engineering problems (Computer Methods in Applied Mechanics and Engineering, 2004).
Więckowski: The material point method in large strain engineering problems (Computer Methods in Applied Mechanics and Engineering, 2004).
Online since: August 2009
Authors: Wei Bing Hu, Qiang Deng
Resolution Wavelet and Online Damage Detection for Composite
Material Structure Dynamic Response Signal
Hu Weibing1,a
,Deng Qiang1,b
1
School of Civil Engineering, Xi'an Univ. of Arch. & Tech.
It is one of the heated research fields in the current engineering application for using wavelet variations to achieve online damage detection and supervision in civil engineering.
Philosophical Transactions of the Royal Society of London Series A-Mechanical Physical and Engineering Sciences, , vol.359(2001),p131-149
It is one of the heated research fields in the current engineering application for using wavelet variations to achieve online damage detection and supervision in civil engineering.