Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: October 2011
Authors: Long Zhu Chen, Hai Yong Xu
It is also important in controlling the deformation of the foundation to ensure the safety of the buildings and structures around the pits.
Journal of Geotechnical Engineering, ASCE, 1993, 119(11): 1751-1770 [2] M.Z.E.B.
Proceedings of the 6th International Conference on Physical Modelling in Geotechnics, Hong Kong, 2006, 2: 1395-1400 [3] Cai Weiming.
Journal of Tongji University-Natural Science,2011,39(6):814-818 [6] DG/TJ08-61-2010.
Chinese Journal of Geotechnical Engineering, 1996,18(4):91-94
Journal of Geotechnical Engineering, ASCE, 1993, 119(11): 1751-1770 [2] M.Z.E.B.
Proceedings of the 6th International Conference on Physical Modelling in Geotechnics, Hong Kong, 2006, 2: 1395-1400 [3] Cai Weiming.
Journal of Tongji University-Natural Science,2011,39(6):814-818 [6] DG/TJ08-61-2010.
Chinese Journal of Geotechnical Engineering, 1996,18(4):91-94
Online since: August 2013
Authors: Feng Gao, Gui Ling Liu, Feng Xian Wang
Concrete construction quality relates to the safety of the structure of buildings, thousands of families of life and property safety.
NDT & E International, 2003, 36: 462-468
Journal of Materials in Civil Engineering, 2003, 15 (3) : 210-211
Journal of Shanxi Datong University(Natural Science), 2012, 28(4):55-57.
Journal of Shanxi Datong University(Natural Science), 2011, 27(4):69-71.
NDT & E International, 2003, 36: 462-468
Journal of Materials in Civil Engineering, 2003, 15 (3) : 210-211
Journal of Shanxi Datong University(Natural Science), 2012, 28(4):55-57.
Journal of Shanxi Datong University(Natural Science), 2011, 27(4):69-71.
Online since: December 2013
Authors: Ai Hua Ji
The emissions from traffic and construction sectors grow faster.
Qingdao should implement the international communication and cooperation in the field of low carbon to attract advanced management methods, technology, capital and talents on abroad.
We also need to draw lessons from the international advanced experience and promote the development of green low carbon projects in Qingdao.
Summary The sustainability of China’ s economic miracle and rapid urbanization is challenged by global climate change and energy safety.
In: American Journal of Preventive Medicine, 35/5, 414-423.
Qingdao should implement the international communication and cooperation in the field of low carbon to attract advanced management methods, technology, capital and talents on abroad.
We also need to draw lessons from the international advanced experience and promote the development of green low carbon projects in Qingdao.
Summary The sustainability of China’ s economic miracle and rapid urbanization is challenged by global climate change and energy safety.
In: American Journal of Preventive Medicine, 35/5, 414-423.
Online since: November 2012
Authors: Byung Sik Chun, Eric Yee, Jongh Wi Lee, Dae Sung Lim
The Namsan #3 Tunnel is a two-lane vehicular traffic tunnel constructed using ASSM.
Wind and vibrations from traffic helped mix the carbon dioxide into the water.
Lee in: Major Tunneling Projects in Korea, International Symposium on Underground Excavation and Tunneling, ITA-AITES (2006), pp 75-84
Aizenberg: Journal of Crystal Growth Vol. 211 (2000).
Saidani: Journal of Crystal Growth Vol. 331 (2011).
Wind and vibrations from traffic helped mix the carbon dioxide into the water.
Lee in: Major Tunneling Projects in Korea, International Symposium on Underground Excavation and Tunneling, ITA-AITES (2006), pp 75-84
Aizenberg: Journal of Crystal Growth Vol. 211 (2000).
Saidani: Journal of Crystal Growth Vol. 331 (2011).
Online since: July 2014
Authors: Shu Cai Li, Dao Hong Qiu, Yi Guo Xue, Fu Dong Xie
Introduction
Metro as a new means of transport in plays a vital role in easing urban traffic congestion, serve the general public with a safe, convenient, comfortable, clean form of transport.
Subway tunnel built on the place that has accumulated soil and geological complex, underground pipeline dense, narrow tunnels, heavy traffic, busy shopping center, and the construction and development along the subway tunnel will due to urban vertical deposition.
In order to ensure the safety of subway tunnels main structure and surroundings, the subway tunnel construction must be carried out settlement monitoring, timely analysis of the monitoring data and feedback, as well as to forecast future settlement[3-5].
References [1] Barry M.New,M.P.0 Reillyy Tunneling indueed ground movement:predicting the magnitude and effeets,in: James D Geddes eds.Proc.4 International Conference on Ground Movement and Stucture,Pentech Press,London,1992,671-697
[5] SONG Kezhi,WANG Mengshu.Reliability Analysis of ground settlement with shield tunnel construction based on Peck Formula [J].Journal of Northern Jiaotong University,2004, 28(4):30-33(In chinese).
Subway tunnel built on the place that has accumulated soil and geological complex, underground pipeline dense, narrow tunnels, heavy traffic, busy shopping center, and the construction and development along the subway tunnel will due to urban vertical deposition.
In order to ensure the safety of subway tunnels main structure and surroundings, the subway tunnel construction must be carried out settlement monitoring, timely analysis of the monitoring data and feedback, as well as to forecast future settlement[3-5].
References [1] Barry M.New,M.P.0 Reillyy Tunneling indueed ground movement:predicting the magnitude and effeets,in: James D Geddes eds.Proc.4 International Conference on Ground Movement and Stucture,Pentech Press,London,1992,671-697
[5] SONG Kezhi,WANG Mengshu.Reliability Analysis of ground settlement with shield tunnel construction based on Peck Formula [J].Journal of Northern Jiaotong University,2004, 28(4):30-33(In chinese).
Online since: December 2010
Authors: Da Lin Li, Qi Lin Zhang
In order to ensure the safety of this structure, a real-time and long-term computer based health monitoring system is applied in the Axis structures.
Introduction The Expo Axis is the central traffic landscape line in Expo site 2010 Shanghai.
After the project is completed and put into use, regular monitoring of the project is used to ensure that the safety and reliability of structure.
Journal of China & Foreign Highway,2001,21(4):92-97
;Schwesinger,P.New generation of the health monitoring system SMS 2001[A].Proceedings of SPIE - The International Society for Optical Engineering, v 4337, p 187-193, 2001
Introduction The Expo Axis is the central traffic landscape line in Expo site 2010 Shanghai.
After the project is completed and put into use, regular monitoring of the project is used to ensure that the safety and reliability of structure.
Journal of China & Foreign Highway,2001,21(4):92-97
;Schwesinger,P.New generation of the health monitoring system SMS 2001[A].Proceedings of SPIE - The International Society for Optical Engineering, v 4337, p 187-193, 2001
Online since: December 2022
Authors: Ping Ji, Wen Dong Fan, Qing Feng Pan, Si Wu
Reflective materials are widely used in road safety facilities and various protective equipment, such as traffic reflective signs, road reflective markings, body reflective identification, reflective raincoats, reflective warning tapes, which can alert drivers at night and avoid or reduce accidents occur.
With the increase of the government's efforts in safety work and the improvement of people's safety awareness, the application of retroreflective materials is not only limited to road traffic, but has also been widely used in firefighting, emergency rescue, rescue, sanitation, municipal, construction and other industries. [1-3] High-refractive-index glass beads are mainly made of high-refractive-index glass water quenching material, which is dried and ground and then fired by flame [4-7].
Journal of Applied Physics, 111(12): 223, 2012
Ceramics International, 35(8): 3037-3042, 2009
Chinese Journal of Silicate, 1(2): 55-76, 1962
With the increase of the government's efforts in safety work and the improvement of people's safety awareness, the application of retroreflective materials is not only limited to road traffic, but has also been widely used in firefighting, emergency rescue, rescue, sanitation, municipal, construction and other industries. [1-3] High-refractive-index glass beads are mainly made of high-refractive-index glass water quenching material, which is dried and ground and then fired by flame [4-7].
Journal of Applied Physics, 111(12): 223, 2012
Ceramics International, 35(8): 3037-3042, 2009
Chinese Journal of Silicate, 1(2): 55-76, 1962
Online since: November 2010
Authors: Wei Huang, Wen Jun Wang, Fu Li Bai, Xiang Hui Zhang
Introduction
Aircraft scheduling is an important component of airline operation control, involving flight safety and effective use of airline fleet resources.
References [1] Zhang Xianghui: Traffic Enterprise Management Vol. 24 (2009), p. 57 [2] Huang Wei, Zhang Xianghui, Wang Wenjun: Traffic Enterprise Management Vol. 29 (2009), p. 65 [3] Ma Hui, Lin Chen: Journal of China Civil Aviation Institute Vol. 23 (2005), p. 11 [4] Sun Hong: Airways flight scheduling model and algorithm(Chengdu: Southwest Jiaotong University, 2003) [5] Sun Hong, Du Wen: Traffic and Transportation Engineering Newspaper Vol. 4 (2004), p. 117 [6] Wei Huang, Xianghui Zhang, Wenjun Wang: AbuDhabi: 13th Air Transport Research Society (ATRS) World Conference (2009) [7] Barnhart C: Flight String Models for Aircraft Fleeting and Routing.
Nottingham UK: Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003), p. 678 [11] Schaefer A J, Johnson E L, Kleywegt A J: Robust Airline Crew Scheduling.
Institute for Operations Research and Management Science Conference (2000) [12] Schaefer A J, Johnson E L, Kleywegt A J: Transportation Science (2005) [13] Ehrgott M, Ryan D: Journal of Multi-Criteria Decision Analysis Vol. 11 (2002), p.139 [14] Yen J, Birge J: A stochastic Programming Approach to the Airline Crew Scheduling Problem.
Seattle: University of Washington (2000) [15] Yu, C.H, Li, H.L: International Journal of Production Economics, Vol. 64 (2000), p.385
References [1] Zhang Xianghui: Traffic Enterprise Management Vol. 24 (2009), p. 57 [2] Huang Wei, Zhang Xianghui, Wang Wenjun: Traffic Enterprise Management Vol. 29 (2009), p. 65 [3] Ma Hui, Lin Chen: Journal of China Civil Aviation Institute Vol. 23 (2005), p. 11 [4] Sun Hong: Airways flight scheduling model and algorithm(Chengdu: Southwest Jiaotong University, 2003) [5] Sun Hong, Du Wen: Traffic and Transportation Engineering Newspaper Vol. 4 (2004), p. 117 [6] Wei Huang, Xianghui Zhang, Wenjun Wang: AbuDhabi: 13th Air Transport Research Society (ATRS) World Conference (2009) [7] Barnhart C: Flight String Models for Aircraft Fleeting and Routing.
Nottingham UK: Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003), p. 678 [11] Schaefer A J, Johnson E L, Kleywegt A J: Robust Airline Crew Scheduling.
Institute for Operations Research and Management Science Conference (2000) [12] Schaefer A J, Johnson E L, Kleywegt A J: Transportation Science (2005) [13] Ehrgott M, Ryan D: Journal of Multi-Criteria Decision Analysis Vol. 11 (2002), p.139 [14] Yen J, Birge J: A stochastic Programming Approach to the Airline Crew Scheduling Problem.
Seattle: University of Washington (2000) [15] Yu, C.H, Li, H.L: International Journal of Production Economics, Vol. 64 (2000), p.385
Online since: February 2015
Authors: Jun Jie Wu, Qian Fu Gui, Shao Hua Zhong
Introduction
We will often encounter different road traffic when driving, in order to meet the need of this situation temporary parking or ramp start is often needed, there is no doubt that it will increase the burden of the drivers and fatigue of driving, especially temporary parking on the ramp needs the drivers to continue touching on the brake pedal.
[4] Chien Tai Huang, Chien Tzu Chen, Shou Yi Cheng, Bo Ruei Chen, Ming Hu Huang: SAE International Journal of Passenger Cars: Electronic and Electrical Systems, Vol.1 (2009) No.1, p.1217
Yeo: SAE International Journal of Passenger Cars: Mechanical Systems, Vol. 2 (2010) No. 2, p.17 [6] ON Semiconductor.
Yoon: International Journal of Automotive Technology, Vol. 11 (2010) No.3, p.387
Kim: International Journal of Automotive Technology, Vol. 15 (2014) No. 3, p.483.
[4] Chien Tai Huang, Chien Tzu Chen, Shou Yi Cheng, Bo Ruei Chen, Ming Hu Huang: SAE International Journal of Passenger Cars: Electronic and Electrical Systems, Vol.1 (2009) No.1, p.1217
Yeo: SAE International Journal of Passenger Cars: Mechanical Systems, Vol. 2 (2010) No. 2, p.17 [6] ON Semiconductor.
Yoon: International Journal of Automotive Technology, Vol. 11 (2010) No.3, p.387
Kim: International Journal of Automotive Technology, Vol. 15 (2014) No. 3, p.483.
Online since: July 2011
Authors: Ji Long Xie, Qiang Li, Guang Xue Yang
The axle is a key component of locomotive and rolling stock, which is directly related to the traffic safety.
The axle consists of journal, shoulder, wheel seat and axle body.
The distance between vertical force input points on axle journals is 1986mm.
P2 is vertical force on the less loaded journal.
International Journal of Fatigue. 1998, p. 135-144
The axle consists of journal, shoulder, wheel seat and axle body.
The distance between vertical force input points on axle journals is 1986mm.
P2 is vertical force on the less loaded journal.
International Journal of Fatigue. 1998, p. 135-144