p.28
p.36
p.41
p.53
p.62
p.67
p.72
p.77
p.87
Variability of Methodical Use of System Models for Determining the Cost in Construction
Abstract:
This article presents a possibility of system-based implementation of determining the cost of work in construction. Based on the principles of systemic and variable visibility a logistics mechanism of the use of systemic economic and mathematical models for determining the cost of work in construction is proposed. The proposed mechanism includes specific regulatory features, contractual proposals and specific features of construction projects. The abovementioned methodology is based on a systemic synthesis of economic feasibility and technological complexity of construction work.
Info:
Periodical:
Pages:
62-66
Citation:
Online since:
May 2017
Authors:
Price:
Сopyright:
© 2017 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: