Analysis and Computation Method of Prestressed Concrete Bridge in Construction Control

Article Preview

Abstract:

Based on solving the problems of pre-camber of the prestressed concrete bridge in construction, the calculation principle of the bridge model constructed in each stage is studied, the relation between forward and backward analysis method is illustrated, and the influencing factors related to characteristics of pre-camber and each controlled point are analyzed. Considering the influencing factors such as the establishment of new elements, the stressing of reinforcement, the shrinkage and creep of concrete in construction, the calculation model is established in accordance with the characteristics of prestressed concrete bridge constructed in each stage. The deformation of each construction segment is calculated with the forward and backward analysis method respectively, so that the pre-camber of each cantilever construction segment is gotten,which is the basis of construction control.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

867-875

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J.N. Xu: Control Technique for Long-span Bridge(People's Communications Press,China 2000).

Google Scholar

[2] Y.J. Ge: Analysis and Control of Bridges Constructed in Stages(People's Communication Press, China 2003).

Google Scholar

[3] M.S. Chueng G.S. Tadros,T. Brown W.H. Dilger,A. Ghali and D.T. Lau:Field monitoring and research on performance of the Confederation Bridge. Canadian Journal of Civil Engineering, Vol. 24 (1997) No.6, pp.951-962.

DOI: 10.1139/cjce-24-6-951

Google Scholar

[4] F.L. Huang X.H. He,Z.Q. Chen and C.H. Zeng:Structural safety monitoring for Nanjing Yangtze River Bridge.Journal of Central South University of Technology, Vol. 11 (2004) No. 3, pp.332-335.

DOI: 10.1007/s11771-004-0068-4

Google Scholar

[5] Z.F. Xiang:Construction Control Technology of Bridge(People's Communication Press, China 2001).

Google Scholar

[6] X.G. Zheng Z.Y. Han and H.F. Xiang:The creep affect analysis of segmentally constructed bridges during their erection.Journal of Tongji University, Vol. 19 (1991) No.3, pp.355-362.

Google Scholar

[7] J.Q. Lei:Cantilever Construction and Design of Bridge(People's Communication Press, China 1999).

Google Scholar

[8] Q.Q. Li:Theory Design and Application of the Self-adaptive Control System(Science Press, China 1990).

Google Scholar

[9] D.H. Yan and G.D. Liu:Forward-iteration method for determining rational construction state of cable-stayed bridges. China Journal of Highway and Transport, Vol. 12 (1999) No.2, pp.59-64.

Google Scholar

[10] M.A. Shahawy and M. Arochiasamy:Field instrumention to study the time-dependent behavior in Sunshine Skyway Bridge.Ⅰ.Journal of Bridge Engineering, ASCE, Vol. 1 (1996) No.2, pp.76-86.

DOI: 10.1061/(asce)1084-0702(1996)1:2(76)

Google Scholar

[11] M.A. Shahawy and M. Arochiasamy:Analytical and measuerd strains in Sunshine Skyway Bridge.Ⅱ. Journal of Bridge Engineering, ASCE, Vol. 1 (1996) No.2, pp.87-97.

DOI: 10.1061/(asce)1084-0702(1996)1:2(87)

Google Scholar

[12] G.W. Housner L.A. Bergmam T.K. Caughey,et al:Sturctural Control:Past,Present and future. Journal of Engineering Mechanics, Vol. 123 (1997) No.9, pp.897-971.

Google Scholar