p.3430
p.3434
p.3438
p.3442
p.3447
p.3451
p.3455
p.3459
p.3463
Application of HHM in Risk Identification of Tunnel Project
Abstract:
Tunnel project contains complex and diverse risk factors. Risk management has an important role on tunneling engineering projects. Risk management is based on risk identification. Only with sufficient knowledge of risk can we analyze,evaluate and control the risk .Traditional risk identification methods are generally targeted at a certain stage of the tunnel project or a particular content of the tunnel project. It can not consider all factors of the tunnel projects. This paper presents a new risk identification method - hierarchical holographic modeling. The method provides a multi-angle decomposition to the perspective of the tunnel features and in order to find the tunnel project risk source. It can provide a basis for risk management.
Info:
Periodical:
Pages:
3447-3450
Citation:
Online since:
October 2011
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: