Research on Support Distribution of the Handling Equipment for 500-Meter Long Rail

Article Preview

Abstract:

Three sets of handling equipment were developed during the renovation of 500-meter long rail production line in Shahe Welding Rail Base Station. The equipment is nonstandard which includes multiple support units to uplift the long rail during its translating process. In this paper the relationship between the number of supports and the performance of the equipment will be discussed in detail.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

650-653

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Liu Hangmen: Mechanics of Material, Higher Education Press, (1991).

Google Scholar

[2] ANSYS, Inc. ANSYS Workbench User's Guide, Release12. 1, Nov. (2009).

Google Scholar