Structure Study of Arch Bridge with a Span of 600m Part II: Measures to Improve Mechanical Performance

Abstract:

Article Preview

Take the trail design of arch bridge with a span of 600m in Part I as the research object, this paper proposes the existing critical problems of the structure, including structure’s static performance, stable problem and dynamic problem. Measures to improve structure’s mechanical performance have been proposed in the respects of structure system, component system and design parameters so as to improve the economy and safety of the structure.

Info:

Periodical:

Edited by:

Honghua Tan

Pages:

294-298

DOI:

10.4028/www.scientific.net/AMM.138-139.294

Citation:

Y. Z. Xie "Structure Study of Arch Bridge with a Span of 600m Part II: Measures to Improve Mechanical Performance", Applied Mechanics and Materials, Vols. 138-139, pp. 294-298, 2012

Online since:

November 2011

Authors:

Export:

Price:

$35.00

[1] Xiao Rucheng, Chen Hong, Wei Leyong. Study, optimization and innovation of bridge structure systems [J]. CHINA CIVIL ENGINEERING JOURNAL, 2008, (41): 69-74.

In order to see related information, you need to Login.