Risk Matrix for Factors Affecting Time Delay in Road Construction Projects: Consultants’ Perspective

Article Preview

Abstract:

The aim of this study is to identify the risk matrix for factors causing time delay in road construction projects in the West Bank in Palestine from consultants’ viewpoint. Three zones were used in the matrix according to the degree of factors severity on the projects’ time delay; which are: green, yellow, and red. The analysis of 43 factors considered in a survey indicates that 2 factors are located in the green zone, 28 factors are located in the yellow zone, and 13 factors are located in the red zone.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

244-248

Citation:

Online since:

December 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Enshassi, A. and Abu Mosa, J. (2008). Risk Management in Building Projects: Owners' Perspective. The Islamic University Journal, 16(1), pp.95-123.

Google Scholar

[2] Odeh, Abdalla M. and Battaineh, Hussien T. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1), pp.67-73.

DOI: 10.1016/s0263-7863(00)00037-5

Google Scholar

[3] Chan, Daniel W. and Kumaraswamy, Mohan M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), pp.55-63.

DOI: 10.1016/s0263-7863(96)00039-7

Google Scholar

[4] Sambasivan, M. and Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), pp.517-526.

DOI: 10.1016/j.ijproman.2006.11.007

Google Scholar

[5] Information on http: /international. fhwa. dot. gov/riskassess/images/riskmatrix. cfm, 20th of March, (2010).

Google Scholar

[6] Palestinian Contractor Union, 2010. West Bank, Palestine.

Google Scholar