A Revised Critical Chain Method and Optimization Model

Article Preview

Abstract:

For product development projects, to void the risk of project delay, all the tasks should be finished as soon as possible. However, the critical chain method (CCM) requires the non-critical tasks to be executed as late as possible. In this paper, the traditional CCM is revised based on the characteristics of product development. Other than the traditional one, the revised CCM is created based on the active plan, that is, all tasks should be executed as early as possible. And then, the schedule scheme of active plan based critical chain method is given, including searching critical chain, no-critical chain and setting buffers. Consulting in the resource constrained project scheduling problem (RCPSP), an optimal model of CCM is built.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

426-430

Citation:

Online since:

October 2009

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2009 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] E.M. Goldratt and C. Chain: Great Barrington: North River Press (1997).

Google Scholar

[2] G.K. Rand and C. Chain: Int J of Project Management, Vol. 18 (2004), p.173.

Google Scholar

[3] W. Herroelen and R. Leus: Journal of Operations Management, Vol. 19 (2001), p.559.

Google Scholar

[4] H. Steyn: International Journal of Project Management, Vol. 20 (2002), p.75.

Google Scholar

[5] C.C. Wei, P.H. Liu and Y.C. Tsai: Int J of Project Management, Vol. 20 (2002), p.561.

Google Scholar

[6] S.X. Liu, J.H. Song and J.F. Tang: Acta Automatica Sinica, Vol. 32 (2006), p.60.

Google Scholar

[7] O.I. Tukel, W.O. Rom and S.D. Eksioglu: European Journal of Operational Research, Vol. 72 (2006), p.401.

Google Scholar

[8] S.X. Liu, J.H. Song and J.F. Tang: Journal of Systems Engineering, Vol. 21 (2006), p.381.

Google Scholar

[9] R.C. Newbold: Boca Raton: The St. Lucie Press (1998).

Google Scholar