Study on Dam Construction Technology without Foundation

Article Preview

Abstract:

In the impervious system of dam construction technology without foundation and the cofferdam, the cut-off wall, seepage curtain or high-pressure jet, oblique wall, etc. do not exist. It does not require pumping pit and need a lot of pit excavation. the technology can save a lot of investment and greatly speed up the construction speed, shorten the construction period. To study dam construction technology without foundation, the method is technically feasible, and no adverse consequences, completely meet the project needs.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1903-1906

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xia Kefeng. Hydraulic and hydroelectric engineering Construction Handbook. Vol.1, China Electric Power Press(2004), in Chinese

Google Scholar

[2] Zhong Denghua, Liu Yong, Huang Wei etc. key Water conservancy and hydropower construction process will focus on the flow control process simulation and optimization methods. Science in China, Vol.39(7), 2009, 1329-1337, in Chinese

Google Scholar

[3] Chen Songbin, Chen Gongjian. Exploration and practice of no pit underwater dam technology. People Pearl .2008.3, in Chinese

Google Scholar

[4] People's Republic of Electric Power Standard, Ground water hydraulic vibro method specification version. China Electric Power Press, (2005), in Chinese

Google Scholar

[5] Xu Hairong, Zhang Zhiwei, Li Ziyong etc. Experiment and construction techniques of vibroflotation compaction of medium-coarse sand with gravel in dam foundation, Water Resources and Hydropower engineering. Vol.36 (12), (2005) , in Chinese

Google Scholar