“Hanging and Top-Down” (HTD) Method of ventilation shaft construction Technology will be described in this paper. Using this method, the shield pass a more shallow ventilation shaft pit quickly just close beneath it, the tuyeres between the tunnel structure and the base slab of ventilation shaft pit are constructed later using a technology similar to “top-down method”, and the tuyeres hang at the base slab of the pit, no dewatering adopted during the construction. This paper will also address efforts at solving the problems the technology encountered, especially the method to control the deformation of tunnel structure.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2621-2624

Citation:

Online since:

May 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GR Yang, and CL Chao: Proceedings of the 7th Conference of Current Researches in Geotechnical Engineering in Taiwan (Taiwan College Press, Taipei 1997)

Google Scholar

[2] Yong Tan, and Mingwen Li: Can. Geotech. J. Vol. 48 (2011), p.704

Google Scholar

[3] Fang-Le Peng, Hai-Lin Wang, Yong Tan, Zheng-Liang Xu, and Yao-Liang Li: J. Geotech. Geoenviron Vol. 137 (2011), p.516

Google Scholar

[4] Y.S. Fang, D. Ju, W.C. Huang, and Y.L. Chien: J. GeoEng. Vol. 1 (2006), p.41

Google Scholar

[5] D. Ju, HT Chen, LM Sun, and SW Duan: Conference on Case Histories of Soft Tunneling (Taipei College Press, Taipei 1997).

Google Scholar

[6] Ni, J.C. and W.-C. Cheng: Tunn. Undergr. Sp. Tech. Vol. 26 (2011), p.435

Google Scholar