Random Factors in the Construction Organization
Abstract:
The construction organization usually takes the Critical Path Method (CPM ) used in the mathematics graph theory, which is a kind of classic system engineering analysis method, was introduced to China by Hua Luogeng – a mathematician, and originally called the Overall Planning Method. This method has been widely applied in various fields of the national economy, especially in the construction field; of course the Overall Planning Method itself has also been greatly developed. Though the Overall Planning Method is relatively mature, there are still a number of uncertainties (random factors) in the construction organization, and it is not easy to make a mathematical description for the Critical Path Method. This paper tries to use random linear programming in the construction organization.
Info:
Periodical:
Pages:
3268-3273
Citation:
Online since:
May 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: