Dynamic Calculation of the Port Highway of Riprap Quantities

Article Preview

Abstract:

In the construction process of the port highway, riprap quantities are difficult to accurately predict which has bought great difficulties to the riprap vessel to organize construction. Besides, it results in a huge waste of riprap in the construction of the port highway, even leads to the riprap vessel aground during construction process. After predicting the undersea terrain model, we can propose plane model and the basic algorithm .By using the algorithm, it is easy to calculate the amount of engineering in the riprap and the undersea terrain changes after the riprap. So we can get a reasonable dumping location. Finally, compared the predicted results with measured results of the seabed elevation after the riprap, the outcome is basically the same. It provides an effective tool for the construction process of the port highway.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1517-1521

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] P. Guanglie: 3 D Terrain Generation Research and Implementation[D],Chongqing University(2005).

Google Scholar

[2] X.Zongfan,W.wenguan: DTM model Method in the Calculation of the Riprap Quantities[J], Water Resources Planning and Design(2010)-4

Google Scholar

[3] L.Hongkui,Z.Hailiang and F.Jie:on the Influence of the Edge Detection of the DTM on the Calculation of the Earth and Rock Engineering [J], Opencast Mining Technology(2010)

Google Scholar

[4] S. Qiuyan. Irregular Triangulation and Visualization realized[D], Central South University (2008),9-12,31-32.

Google Scholar

[5] Z.Pengfei: Planning Research for the Computerization and Balance Allocation in Hydropower project earthwork volume[D],Whhan University(2004)

Google Scholar

[6] L. Yunzhi,L. Jieyi:Civil Engineering Earthwork Calculation and Application[J], Enterprise Science And Technology & Development(2008) ,14:131-134.

Google Scholar

[7] C. Jijiang, S. Lisong and M. Hongxiang: Monitoring Early-warning System for Protection of Water Area Based on WebGIS [J], Water Resources and Power(2011), 29(2):136-139.

Google Scholar