Construction of Adjustment Model of Traffic Volume Forecast in The Latter Part of Expressway Operating

Article Preview

Abstract:

This paper focuses on the problem of serious deviation about predicted traffic flow on the feasibility study stage of expressway,puts forward an idea to compare and analyse the predicted traffic flow in feasibility study stage and the actual traffic after project operation,introducts least square method model, and finds out the linear relationship between them, thus predicts traffic flow of expressway operation. Finally, the calculation is made by combining with concrete expressway project,which proves that this method is usefull to improving the accuracy of the traffic flow forecast.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1526-1531

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Honghong Zhang: Some problems about evaluation study of expressway construction project. Ph.D.Thesis of Changan University.24-25(2004).In chinese.

Google Scholar

[2] Na Zhang and Changfeng Rui:The combing and solution of predicted traffic flow.China,roads.160-165(2011). In chinese.

Google Scholar

[3] M.bechman: The evaluation of our country,s expressway project. The traffic engineering fixed station of department of Communication of Shanxi Province. 92-94(2007).

Google Scholar

[4] Jinmei Wu and Xiaodong Ling: The least square estimation method . Statistics and decision. 42-46(2006). In chinese.

Google Scholar

[5] K.Heanue: Traffic prediction theories and methods. Ph.D.Thesis of Dongnan University. 25-28(2009).

Google Scholar