Based on the Minimal Stress Method for the Determination of the Reasonable Completed Bridge Cable Force

Article Preview

Abstract:

The cable-stayed bridge is a type of the bridges that can utilize the material properties fully and rationally.They are most favored by designers both at home and abroad with its good economic performance and crossover capability. we use the method of the minimal stress with constraints to optimize the cable force of the completed bridge under dead loads. In this way, we can attain the goal of reducing the project cost.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2058-2061

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GengdongCHENG.Engineering structure optimization design basis .Beijing: Water conservancy electronic publishing department,1983.

Google Scholar

[2] YiXUE.The optimization principle and method.Beijing:Beijing Industrial university publishing department,2001.

Google Scholar

[3] NaLUO.Three cable-planes and three trusses cable-stayed bridge's spatial cable tension optimization[C]. Master's degree thesis of the Central South University . 2009.5:15~22

DOI: 10.4028/www.scientific.net/amr.163-167.511

Google Scholar

[4] JunYANG. Research on Rational Completion State and Construction Control of Long Span Bridges Based on Influence Matrix[D]. the master's degree paper of WuHan university of Tecnology. 2008.4:32~36

Google Scholar

[5] JianminZHANG. First Order Optimization Method for Reasonable Finished Dead State of Cable-stayed Bridge.Shanghai: Chinese Quarterly of Mechanics. 2004,(25):297~303

Google Scholar