Change Order Audit in Machinery Enterprise Base on the Delivery Schedule and Loss Cost Estimate

Article Preview

Abstract:

When order change happens, enterprises hope to be able to estimate the earliest/latest and loss cost. This can help make the produce plan and meet the delivery time requirements of customers. In this paper, model to estimate the loss cost and delivery time caused by order change is built. Also, method to audit order change by level constraint is proposed.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

53-56

Citation:

Online since:

July 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Meng Fansheng. Discuss on Selection of Manufacturing Cost - Calculation Models. COMMERCIAL RESEARCH, 2004(15).

Google Scholar

[2] Xu Xiang-bin; Zhou Xin-jian. The research and development of product's BOM auto-generation from CAD system. Machinery Design & Manufacture, 2007( 11).

Google Scholar

[3] Chen You-fu. Probe into AutoCAD platform-based CAE/BOM/CAD integrated system. Manufacturing Automation, 2010(12).

Google Scholar

[4] Zhen Yongqian; Chen Meng . Research on A Manufacturing Cost Estimating Method Based on ABC. Manufacturing Technology & Machine Tool, 2010(7).

Google Scholar

[5] Wang Gui-qin, Wang Zhao-hui, Jia Rui-feng. Research on Cost Estimating System for Mechanical Parts Manufacturing Based on Similarity. Machine Building & Automation, 2009 (1).

Google Scholar