p.1075
p.1079
p.1086
p.1090
p.1095
p.1099
p.1103
p.1109
p.1113
Selective Disassembly Strategy Based on the CAD Model Assembly Building
Abstract:
The assembly building is sought after by people For its speed, subject to the constraints of climate conditions, seismic energy saving and environmental protection, construction of low cost, flexible and diverse housing. However, in the assembly building maintenance, scrap processing and recycling of how to improve the efficiency of demolition is a new issue to be resolved. In this paper, based on the components of the demolition wave optional disassembly planning algorithm, by the definition of prefabricated building demolition wave is a topological relationship of certain components in the assembly building to reflect the components of the demolition order. The calculation of the algorithm is small, easy to use it to carry out efficient search, optional optimal component disassembly sequence, and thus improve the efficiency of disassembly.
Info:
Periodical:
Pages:
1095-1098
Citation:
Online since:
August 2012
Authors:
Keywords:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: