The Design and the Construction of Measures of the Retaining Pile
Abstract:
In the hole excavated for building foundation depth big hole excavated for building foundation supports and protections, has used the guard stake design proposal, when the guard stake design laying depth cannot satisfy the design request, can create encircles the guard stake tilting and the soil bank jitter.In through limitedly puts the design and the construction processing plan measure which the slope, the sunk shaft and the central island unify, has achieved the project request effect.