Research on Span of Manufacturing Task with Time-Sequence Constraint for Manufacturing Collaborative Alliances

Article Preview

Abstract:

For the manufacturing task of manufacturing collaborative alliances, the relationship between manufacturing task programming and manufacturing resources deployment is analyzed and the model for the span of manufacturing task with time sequence constraint is constructed. The problem of span programming of manufacturing task with time sequence constraint is analyzed by integrating qualitative and quantitative methods from production period for the manufacturing task. The mathematical formulations of influential factors and task span are constructed, and the optimal values of task span are obtained. By analyzing the results of quasi-quantitative study, some meaningful results that benefit to programming for collaborative manufacturing task are achieved.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

975-978

Citation:

Online since:

October 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] H. Z. Dong, Y. Chen, and Y. W. Zhao: Chinese Journal of Mechanical Engineering,Vol. 40 (2004), pp.28-33.

Google Scholar

[2] H.N. Chen, H. Z. Huang and H. Zhao: Journal of Xi'an JiaoTong University ,Vol. 40 (2006), pp.57-61.

Google Scholar

[3] J. H. Hao, S. D. Sun and X. L. Wu: Computer Integrated Manufacturing Systems, Vol.12 (2006), pp.451-457.

Google Scholar

[4] Y.X. Gu and Y. S. Fan: Systems Engineering, Vol. 21 (2003), pp.23-27.

Google Scholar

[5] W.G. Fang, H. Zhou and Y. Shang: Journal of Beijing University of Aeronautics and Astronautics, Vol.24 (1998), pp.659-661

Google Scholar

[6] D. Wang: Computers & Industrial Engineering,Vol. 28 (1995), pp.425-436.

Google Scholar

[7] W.H. Ip, K.L. Yung, and D. W. Wang: Int. J. Production Economics, Vol. 87 (2004), pp.195-205.

Google Scholar